Laserfiche WebLink
City Council Regular Meeting Minutes <br /> • May 12, 1998 <br /> Page 4 <br /> 1 are in favor of the addition of the sidewalk. There were concerns expressed in regard to the <br /> 2 maintenance. Ranallo stated the City will maintain the sidewalks. <br /> 3 Motion by Faust, second by Marks to accept the proposal for installation of sidewalks on the east <br /> 4 side of Silver Lake Road between 37'Avenue and Silver Lane at the cost presented by Dan <br /> 5 Solar, Ramsey County and to include this in the overall Silver Lake Road Bridge Project. <br /> 6 Motion carried unanimously. <br /> 7 Mornson noted this would be funded as much as possible with.MSA funds. <br /> 8 Cavanaugh asked if this would connect to the sidewalk on 37`'Avenue. He also questioned if the <br /> 9 City Manager could write the transit authorities and request that a bus shelter be built at the <br /> 10 location in front of the bank. <br /> 11 Mr. Solar noted this sidewalk will connect with the sidewalk on 37'Avenue. He stated there are <br /> 12 criteria which need to be met for the installation of a bus shelter. However, the area of that bus <br /> 13 stop could be paved out to the street. This would allow for ease of snow removal, location of the <br /> 4 bench and a potential for location of a shelter in the future. <br /> 15 Mr. Solar stated the final element of the project is the determination of the extent of bridge <br /> 16 enhancements. He explained that Option 1 includes sidewalks and a wall with a railing on the <br /> 17 top. The cost to build this Option is $43,000 and is being used as the base cost by Ramsey <br /> 18 County. This style of bridge would be built at no cost to the City. The City has, however, asked <br /> 19 Ramsey County to develop possible alternatives. <br /> 20 Mr. Solar presented Option 2 which would include an enhanced edge with ornamental bases and <br /> 21 lighting. It would include a more decorative railing and possibly facing on the sides of the <br /> 22 bridge. This Option would cost$27,000 above the base cost of$43,000. <br /> 23 Mr. Solar presented Option 3 which would include the same features as Option 2, but at a more <br /> 24 enhanced level. It would also include more lights and bump-outs to extend the walls. This <br /> 25 Option would cost$39,000 above the base cost of$43,000. <br /> 26 Mr. Solar presented Option 4 which would include the same features as Option 3, but at an even <br /> 27 more enhanced level. This Option would cost$69,000 above the base cost. <br /> 28 Mr. Solar noted that Options 2, 3, and 4 would be for decorative purposes only and would not <br /> 29 add any safety features to the bridge. <br /> WFaust noted that the Council has been discussing this since the first meeting in regard to this <br /> .31 project in December of 1996. He stated this would be an asset to the community, would be in <br />