My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 05251999
StAnthony
>
City Council
>
City Council Minutes
>
1999
>
CC MINUTES 05251999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:46:29 PM
Creation date
12/30/2015 4:46:27 PM
Metadata
Fields
SP Box #
19
SP Folder Name
CC MINUTES AND AGENDAS 1999
SP Name
CC MINUTES 05251999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Meeting Minutes <br /> • May 25, 1999 <br /> Page 3 <br /> 1 E. 1999 Street and Water Main Improvements: <br /> 2 1. Northdale Construction Company in the amount of$55,153.77 for 1999 street and <br /> 3 watermain improvements. <br /> 4 F. Silver Point Park and Central Park Storm Water Improvements: <br /> 5 1. Richard Knutson. Inc. in the amount of$56,486.88 for Silver Point Park& <br /> 6 Central Park Stormwater Improvement Project. <br /> 7 G. 2 pages of Verified Claims as presented by the Finance Director. <br /> 8 <br /> 9 Motion carried unanimously. <br /> 10 <br /> 11 VII. REPORTS. <br /> 12 A. Planning Commission- May 18. 1999. <br /> 13 Mayor Ranallo welcomed Planning Commissioner Randy Stille and invited him to <br /> 14 address the Council. <br /> 15 <br /> 16 1. Sunset Memorial Cemetery: for 2250 St. Anthony Boulevard; side yard setback <br /> 17 variance request. <br /> Stille explained the owners of Sunset Memorial Cemetery are requesting a sideyard <br /> variance request to construct a sidewalk around the mausoleum. He added the Planning <br /> 20 Commission recommends approval of this request. <br /> 21 <br /> 22 Marks asked what hardship had been found in connection with this request. Stille stated <br /> 23 the sidewalk is needed to accommodate staff operating heavy equipment as well as for <br /> 24 families visiting the mausoleum and grounds in inclement weather. <br /> 25 <br /> 26 Cavanaugh stated the sidewalk seems to be an integral part of the mausoleum, and asked <br /> 27 why it wasn't included in the original design. Dennis Bridges, a representative from <br /> 28 Sunset Memorial Park, stated the original building permit did not incorporate sidewalks <br /> 29 around the entire structure, which needed to be in the original permit process. He added <br /> 30 they thought they could complete the process after the building was built,but then <br /> 31 discovered they would be encroaching on the setback. <br /> 32 <br /> 33 Marks stated the necessary hardship must relate to City ordinances or unusual topography <br /> 34 or shape of the property. Stille stated the omission of the sidewalks from the.original <br /> 35 plan was an oversight on the part of the contractor and probably would have been initially <br /> 36 approved. <br /> 37 <br /> 38 Ranallo noted the welfare and safety of staff and visitors is affected by the lack of a <br /> 39 sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.