My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03071989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 03071989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:35:26 PM
Creation date
12/30/2015 4:35:21 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 03071989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 24, 1989 <br /> Mr. Larry Hamer <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Proposal for Engineering Services <br /> Feasibility Study <br /> Street Repair and Cost Study <br /> RCM File 10024.00 <br /> Dear Mr. Hamer: <br /> This letter is in response to your recent request for a proposal to <br /> provide a feasibility study for repair of the following streets: <br /> 1. 33rd Avenue from Stinson Blvd. to Old Highway 8. <br /> ETT 2. 37th Avenue from Stinson Blvd. to Silver Lake Road. <br /> 3. Stinson Blvd. from 37th Avenue to Silver Lane. <br /> rieke 4. Chandler Drive from 37th Avenue to City Limits. <br /> carroll <br /> •mullertes,inc. We propose to review the structural condition of these streets from <br /> associainformation that may be available or developed through tests made by a <br /> enggineers geotechnical testing company. In addition, we will review the condition <br /> architects of existing utilities in these streets based on available information and <br /> land surveyors g � <br /> interviews) to determine if replacement or upgrading should be <br /> equal opportunity considered at this time. Concrete panel replacement, total replacement <br /> employer of streets, milling and overlay of the asphalt surfaces and other <br /> appropriate alternatives will be evaluated in the study. Costs will be <br /> developed and recommendations made to the City to determine their <br /> course of action for these projects. <br /> We propose to provide the feasibility study as outlined above at our <br /> standard hourly rates not to exceed $3,700.00. This figure does not <br /> include the cost of soil borings and testing or assessments/rolls that may <br /> be necessary to complete the feasibility study. <br /> If you have any questions regarding this proposal, I would be happy to <br /> discuss them with you in more detail. We look forward to serving you <br /> on these projects. <br /> Sincerely, <br /> Robert C. Robertson, P.E. <br /> RIEKE CARROLL MULLER ASSOCIATES, INC. <br /> RCR:jj <br /> • <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka, minnesota 55343 <br /> 612-935-6901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.