Laserfiche WebLink
24—Jan-94 <br /> • <br /> CITY OF COLUMBIA HEIGHTS <br /> RUBBERIZED RAILROAD CROSSING <br /> STINSON BLVD, NORTH OF 37TH AVE <br /> MUNICIPAL PROJECT 9402 <br /> ENGINEER'S ESTIMATE <br /> NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL <br /> 1 Traffic control 1 L.S. $1,000 $1,000 <br /> 2 Disposal of existing crossing surface 1 L.S. $2,000 $2,000 <br /> (ties and asphalt) <br /> 3 Rubber surfaced crossing material 52 L.F. $200 $10,400 <br /> 4 Asphalt/concrete pavement 1,200 S.F. $10 $12,000 <br /> TOTAL COSTS $25,400 <br /> CITY OF COLUMBIA HEIGHTS SHARE $12,700 <br />