PARTIAL PAY ESTIMATE <br /> #5(FINAL) <br /> FROM: MAY 27, 1994 <br /> TO: JULY 8, 1994 <br /> CONTRACTOR: PROGRESSIVE CONTRACTORS,INC. <br /> ADDRESS: 8736 ZACHARY LANE,OSSEO.MN 55369 <br /> OWNER: CITY OF ST.ANTHONY,MINNESOTA <br /> PROJECT: 37TH AVENUE CONCRETE STREET REHABILITATION <br /> COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL: November 13, 1993 ORIGINAL: 4 241.179.60 <br /> REVISED: REVISED: $ <br /> X: THIS <br /> . . ......... . ........ <br /> ................... .. ... <br /> CONTRACT TOTAL€T0 DATE:": <br /> .............. <br /> .... ......... <br /> .:ITEM. <br /> ........ .. ................xx b <br /> T M ESP <br /> ItIM <br /> ND ... <br /> ............ <br /> X <br /> N UNIT <br /> ........... ..... ... <br /> SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS <br /> I MOBILIZATION LS 1 $28,700.00 0 $0.00 1.0 $26,700.00 <br /> 2 REMOVE CONC. CURB&GUTTER LF 20 $7.00 0 $0.00 19 $133.00 <br /> 3 66 CONCRETE CURB LF 20 $15.00 0 $0.00 19 $285.00 <br /> 4 CL. 5 AGG. ( 100% CRSHD LIMESTNE) TON 500 $10.00 0 $0.00 0 40.00 <br /> 5 CONCRETE PAVEMENT PLANING SY 10500 63.75 0 $0.00 9387 435,201.25 <br /> 8 SEAL CONCRETE PAVEMENT(3723) I.S. 1250 $3.00 0 $0.00 1450 $4,350.00 <br /> 7 SEAL CONCRETE PAVMNT(SILICONE) I.S. 900 $7.50 0 $0.00 1142.5 68,568.75 <br /> 8 1/2*JOINT REPAIR(TYPE A-1 MOD) LF 8000 $1.00 0 $0.00 5452 $5,452.00 <br /> 9 1/2*LONGITDNL.JNT. TRIP. (TYPE A-5) LF 11500 $0.80 0 $0.00 10400 68,240.00 <br /> 10 CRACK REPAIR(TYPE A-3) LF 250 $1.50 0 $0.00 271 $408.50 <br /> 11 SPOT SURFACE REPAIR(TYPE B-2A) SF 540 $15.00 0 $0.00 519 $7,785.00 <br /> 12 SURFACE REPAIR(TYPE B-2B) (>30SF) SF 180 $10.00 0 $0.00 0.4 $64.00 <br /> 13 SPOT FULL DEPTH REPAIR(TYPE C-1) SF 655 $23.00 0 60.00 584.4 $13,441.20 <br /> 14 CONCRETE PAVEMENT(TYPE D) SY 1700 $35.00 0 60.00 1684 $58,940.00 <br /> 15 NO. 8 REINFORCEMENT BARS LB. 6800 $1.50 0 $0.00 6092 $9,138.00 <br /> 18 F&I NEEHNAH R-3250-1 CASTING ASSMBL EA 1 $400.00 0 $0.00 2 $800.00 <br /> 17 TRAFFIC CONTROL Ls 1 $10,000.00 0 60.00 1.0 $10,000.00 <br /> 18 ADJUST M.H. CASTING EA 17 4150.00 0 $0.00 a 41,200.00 <br /> 19 ADJUST C.S. CASTING EA 7 $175.00 0 $0.00 2 6350.00 <br /> 20 PAVEMENT MARKINGS LS 1 41,100.00 0- $0.00 1 $1,100.00 <br /> T SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS-Total $0.00 6190,154.70 <br /> SCHEDULE 2.0 SIDEWALK CONSTRUCTION <br /> 1 REMOVE CONC. CURB&GUTTER LF 28 $0.00 0 $0.00 25 $150.00 <br /> 2 CL. 5 AGG. (100% CRSHD LIMESTONE) TON 240 612.00 0 $0.00 204.04 $2,448.48 <br /> 3 4' THICK CONCRETE SIDEWALK SF 10990 $1.60 0 $0.00 9915 415,884.00 <br /> 4 8'THICK CONCRETE SIDEWALK SF 1000 $2.15 0 $0.00 880 61,402.00 <br /> 5 PEDESTRIAN RAMP EA 2 $300.00 0 $0.00 2 6800.00 <br /> 0 REMOVE ASPHALT PAVEMENT SY 75 $8.00 0 $0.00 205 $1,230.00 <br /> 7 REMOVE CONCRETE PAVEMENT SY 85 $12.00 0 $0.00 78.5 $942.00 <br /> 8 2' SIT. DRIVEWAY RESTORATION SY 75 $12.00 0 $0.00 136 $1,632.00 <br /> 9 CLEARING &GRUBBING TREES LS 1 $1,500.00 0 $0.00 1 $1,500.00 <br /> 10 ADJUST M.H. CASTING EA 7 $180.00 0 $0.00 2 $320.00 <br /> 11 SELECT TOPSOIL BORROW CY 160 $10.00 0 $0.00 0 $0.00 <br /> 12 SOD, LAWN&BOULEVARD TYPE SY 2850 41.95 980 $1,911.00 2450 $4,777.50 <br /> 13 SO CONCRETE CURB LF 28 $15.00 0 60.00 25 $375.00 <br /> T SCHEDULE 2.0 SIDEWALK CONSTRUCTION-Total $1,911.00 431,300.98 <br /> SCHEDULE 3.0 HENNEPIN CO.WORK-ADDED <br /> I TRAFFIC CONTROL LS 1 $1,016.60 0 $0.00 0.5 $508.30 <br /> 2 CONCRETE PAVEMENT(TYPE D) SY 143 $35.00 0 $0.00 43.0 $1,505.00 <br /> 3 REBAR L8S 1000 $1.50 0 40.00 300.0 $450.00 <br /> T SCHEDULE 3.0 HENNEPIN COUNTY WORK ADDED-Total 60.00 $2,463.30 <br /> TOTAL THIS PERIOD $1.911.00 <br /> TOTAL TO DATE $223,918.98 <br />