• SUMMARY OF CHANGES & SCHEDULE <br /> The following are changes and notes regarding the current plans,cost estimate and area analysis: <br /> Area Changes: <br /> Booster dub storage:changed from 900 S.F.to 1600 S.F. (+700 S.F.) <br /> Booster club gym:changed from 9900 S.F.(90'x 110')to 9000 S.F.(90x 1007(-900 S.F.) <br /> • The aggregate decrease in size is 200 S.F., however due to increases in wall thickness based on structural <br /> requirements,this results in an actual decrease in area by 140 S.F. <br /> • The overall area of the building has increased several hundred square feet due to the widening of corridors(based <br /> on code requirements for exit widths), and increased thicknesses of some structural walls. <br /> Recent Plan Modifications: <br /> • Conference room moved next to the Council Chambers. <br /> • Sally port mezzanine eliminated,and one additional car bay added. There is no cost difference to make this <br /> change. <br /> Booster dub storage area increased and gym size reduced,as mentioned above. <br /> ' Several offices and storage areas in the police department have been moved to better meet the needs of the <br /> department. <br /> The community services offices have been moved and are now accessible from the main lobby. <br /> • The City Clerk's office has been moved closer to the reception area and copy room. <br /> Schedule: <br /> • We are currently working on construction documents for the building and have begun to involve our consulting <br /> engineers. Structual engineers Bakke,Kopp, Ballou and& McFarlin have already provided us with preliminary <br /> structual joist sizes, in order that we may develop accurate building sections and details. We would like to <br /> involve the mechanical and electrical engineers as soon as possible. Once the consultants begin work, any <br /> changes to the building will mean adjustments by all disciplines involved,which increases the amount of <br /> coordination time and reworking. It is important that we finalize the building plan in order to meet the September <br /> bid date. <br /> • We are in the process of making some additional minor changes based on recent meetings with each <br /> department. <br /> • We are also working with Booster Club members to finalize the design of their areas as well. <br /> 1 <br />