My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10241995
StAnthony
>
City Council
>
City Council Packets
>
1995
>
CC PACKET 10241995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:26:13 PM
Creation date
12/30/2015 6:26:07 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 10241995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pape 3 of 3 <br /> Part C: Mlti and Overlay Streets <br /> Bid Bid Bid Previous Current Quantity Current Cost <br /> Rem Rem Description Unit Quantity Unit Price Amount Quantity Quantity to Date Amount to Date <br /> 2021.501 Mobilization LS 1 $1500.00 $1500.00 1 1 $0.00 $1,500.00 <br /> 2104.501 Remove Bituminous Pavement SY 650 $1.25 $812.50 752.03 752.03 $0.00 $940.04 <br /> 2104.501 Remove Concrete Curb and Gutter LF 900 $3.00 $2 700.00 633 633 50.00 $1.899'00 <br /> 2104.505 Remove Concrete Dmewa ron SY 12 $8_00 $98.00 0 38.2 38.2 $305.60 $305.60 <br /> 2104.511 Sawcut Bituminous Pavement LF 1100 $1.50 $1,650.00 0 0 $0.00 $0.00 <br /> 2211.501gre�ate Base CL 5 100%Crushed Qua Rock TON 70 $9.50 $665.00 0 0 $0.00 $0.00 <br /> 2232.501 Mill Bituminous Pavement(i*to 2 SY 9690 $0.65 $8,428.50 9891.39 9891.39 $0.00 $6,429.40 <br /> 2232.502 Mill Concrete Pavement(1'to 2 SY 85 $10.00 $850.00 74.98 74.98 $0.00 $749.80 <br /> 2331.508 1 1/2' T 41A BR. Wear Course TON 900 $24_75 $22,275.00 1005.31 1005.31 $0_00 $24,881_42 <br /> 0331.606 Crack Sealant LB 2100 $2.00 $4,200.00 0 0 $0.00 $0.00 <br /> 2351.507 6'Thick Concrete n SY 12 $21.20 $254.40 0 38.2 38.2 $809.84 $809.84 <br /> 2357.502 Bituminous Tack Material GAL 525 $1.60 $840.00 400 400 $0.00 $_640.00 <br /> 2531.503 T Wide Concrete ValleyGutter FA 2 $900.00 $1 800.00 2 2 $0.00 $1.800:00 <br /> 2575.505 <br /> Sod TM-fawn SY 200 $1.50 $300.00 100 100 10.00 1150.00 <br /> -- -- - - -- <br /> Spec 7^-._ Sawing Concrete Curb and Gutter - FA 80 53.50_.5280,00 80 __- , 60 $0.00 $210.00 <br /> Spa 8 Patch Bituminous _SY 850 $8.00 E3�900_00 752.03 752.03 $0.00_$4 512.19 <br /> S 9 Concrete Curb and Gutter LF 900 $9.00 $81100.00 633 833 $0.00 55,697.00 <br /> Baia Bid for Pert C $56 851.40 i1 116.44 _i50�524.28 <br /> Change Orders <br /> Bid Bid Bid Previous Current Quantity Current Cost <br /> Rem Item_Descn'ption Unit Quantity Unit Price Amount Quantity Quantity to Dale Amount to Date <br /> No.1 4'PVC Service Pipe LF 65 $9.50 $617.50 68 68 $0.091 $646.00 <br /> No.1 8'x 4'Saddle Wye EA 2 $200.00 $400.00 1 2 ;9.-Oql $_400.66 <br /> No.1 Conned to Existing Sewer Main EA 2 $600.00 $1,200.00 21 2 $0.00 $1,200.0 <br /> 01 <br /> No.2 8'PVC 0'-17 Depth LF 200 $28.75 $5750.00 200 200 $0.00 $5,750.00 <br /> No.2 8'PVC 1744'Depth LF 300 $34.50 $10,350.00 300 300 $0.00 $1050.00 <br /> No.2 8'PVC 14'-18'De th LF 100 $40.71 $4 071.00 103 103 $0.00 $4,193.13 <br /> No.2 8'x 6'Service es FA 16 $460.00 $71360.00 14 14 $0.00 $811!10;00 <br /> No_2 8'DIP Service Pile -LF 160 $17.25 $2,760.00 90 90 10.00 __$1,552.50 <br /> -- A $ - - - <br /> No,2..____.!Conned to Existing MH. EA... ...---.3 -_`5882,50 -- $2,587,50 -3 _... ....... .....---•- ---3 _ $0.00 _$2.567.50 <br /> No.2'*" PIQe Foundation Material -__ - ___ TON 100 $17.25_$1 725.00 46.21 __ 46.21 ___$0.00 - $787.12 <br /> No.2 PlupSanRe MH flowcontrol) <br /> _LS 1 $1,725.00 $11725.00 1 1 $0.00 _ $1,725.00 <br /> No.2 Mold Power.Poles F�4 6 $345.00 $2,070.00 0 0 $0.00 $0.00 <br /> Total Change Orders $40,616.00 $0.00 335,841.25 <br /> Total Base Bid for Parts A,B.C and Change Orders $466,996.25 $23,345.18 $442.854.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.