My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12061995
StAnthony
>
City Council
>
City Council Packets
>
1995
>
CC PACKET 12061995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:26:52 PM
Creation date
12/30/2015 6:26:46 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 12061995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joint Powers Agreement <br /> Columbia Heights/St. Anthony • <br /> Page 2 <br /> II. <br /> The construction of this project shall be under the supervision and direction of the Columbia <br /> Heights City Engineer in accordance with the plans. However, the City- of St. Anthony shall <br /> cooperate with the City Engineer and his staff at their request to the extent necessary, but will <br /> have no supervision of the work. Notwithstanding anything herein to the contrary, Columbia <br /> Heights may retain consultants or other professionals to perform any or all of the responsibilities <br /> and/or duties of Columbia Heights herein. <br /> III. <br /> Both cities agree that any license required to perform electrical work must be obtained through <br /> the Columbia Heights Inspection/Licensing Department. Electrical inspection fees shall not be <br /> made more than those established by the State Board of Electricity in the most recent recorded <br /> Electrical Inspection Fee schedule. Both parties also agree to provide all necessary permits and <br /> permission to construct said signal system at no cost. <br /> IV. <br /> Columbia Heights shall install, or cause the installation of adequate three wire, 120/240 volt, <br /> • <br /> single phase, alternating current electrical power connections to the controller cabinet. The costs, <br /> if any, for the installation of the power sources, shall be shared equally by both parties. <br /> Columbia Heights shall also provide the electrical energy for the operation of the traffic control <br /> signal system to be installed. The electrical costs will be shared by both parties as stipulated in <br /> Article VIII of this Agreement. Columbia Heights will enter into appropriate contracts and will <br /> obtain appropriate payment and performance bonds and insurance for the project in accordance <br /> with all applicable laws. <br /> V. <br /> The estimate of the total cost for the traffic control system, engineering, and other contract work <br /> to complete the project is $106,200. Each City Council shall approve the contract prior to its <br /> award. <br /> VI. <br /> All records kept by each party with respect to this project shall be subject to examination by the <br /> representatives of the other parties hereto. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.