My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12061995
StAnthony
>
City Council
>
City Council Packets
>
1995
>
CC PACKET 12061995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:26:52 PM
Creation date
12/30/2015 6:26:46 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 12061995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE C <br /> Project Costs <br /> Tenant Improvement Costs <br /> Item Estimated Cost Percent Complete value <br /> Upgrade all office, entryway <br /> and employee break and locker <br /> space to acceptable condition $ 29,500 90 $27, 000 <br /> Reconfigure HVAC to ventilate <br /> production area 4,000 <br /> Clean up and upgrade outside <br /> appearance including landscaping, <br /> exterior painting, parking lot <br /> patching, sweeping and striping 24,500 50 12, 500 <br /> • Provide upgraded electrical service <br /> to meet tenant requirements 25,000 100 25,1000 <br /> Upgrade entire building interior <br /> and exterior lighting (to be handled <br /> through NSP Energy Efficient <br /> Lighting Program) -0- <br /> Install a complete fire protection <br /> sprinkler system 82,000 75 62, 000 <br /> Upgrade all restrooms to acceptable <br /> condition 10,000 50 5,000 <br /> Repair all broken glass 3,000 100 3,000 <br /> Repair and make weathertight all <br /> loading and passage doors 10,000 75 7, 500 <br /> Modify interior wall structures to <br /> suit tenant requirements 12 100 121000- <br /> $200,000 <br /> 2, 000$200,000 $154, 000 <br /> C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.