Laserfiche WebLink
SCHEDULE C <br /> Project Costs <br /> Tenant Improvement Costs <br /> Item Estimated Cost Percent Complete value <br /> Upgrade all office, entryway <br /> and employee break and locker <br /> space to acceptable condition $ 29,500 90 $27, 000 <br /> Reconfigure HVAC to ventilate <br /> production area 4,000 <br /> Clean up and upgrade outside <br /> appearance including landscaping, <br /> exterior painting, parking lot <br /> patching, sweeping and striping 24,500 50 12, 500 <br /> • Provide upgraded electrical service <br /> to meet tenant requirements 25,000 100 25,1000 <br /> Upgrade entire building interior <br /> and exterior lighting (to be handled <br /> through NSP Energy Efficient <br /> Lighting Program) -0- <br /> Install a complete fire protection <br /> sprinkler system 82,000 75 62, 000 <br /> Upgrade all restrooms to acceptable <br /> condition 10,000 50 5,000 <br /> Repair all broken glass 3,000 100 3,000 <br /> Repair and make weathertight all <br /> loading and passage doors 10,000 75 7, 500 <br /> Modify interior wall structures to <br /> suit tenant requirements 12 100 121000- <br /> $200,000 <br /> 2, 000$200,000 $154, 000 <br /> C-1 <br />