My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01161996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 01161996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:27:23 PM
Creation date
12/30/2015 6:27:16 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 01161996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OJ/02/96 17: 20 V612 937 5S22 IIESTIWOD PRO SNS i�Lu1,) <br /> Page 16 <br /> DRAFT—Silver Lake Center EAW <br /> January 2, 1996 <br /> hern site driveway <br /> The l of service with Phase 1 or Phase r2 development f no mLake Road and the itigation will <br /> �r <br /> gation Is pu a ed. If signalized,this <br /> leve <br /> Intersection would operate In the level B range. <br /> 23. Vehicle-related air emissions Provide an estimate of the effect of the project's traffic generation on air <br /> quality,including carbon monoxide levels. Discuss the effect of traffic improvements or other mitigation <br /> measures on air quality impacts. (If the project involves 500 or more parking spaces, consult "EAW <br /> Guidelines"about whether a detailed air quality analysis is needed) <br /> The Increased traffic wlll generate a corresponding Increase In(Appendix ,themonoxideon rolevels other <br /> project will not have a <br /> vehicles-related air emissions. As no <br /> lrt the Traffic Study(Appp A) P 1 <br /> significant negative Impact on traffic operations and therefore negligible Impacts on air quality are <br /> expected. No measures to mitigate air quality Impacts have been considered. <br /> 24. Stationary source air emissions Will the project involve any stationary sources of air emissions(such as <br /> boilers or exhaust stacks)?❑Yes Q No <br /> if yes,describe the sources,quantities,and composition of the emissions;the proposed air pollution control <br /> devices;the quantities and composition of the emissions after treatment;and the effects on air quality. <br /> At this time,It is anticipated that no stationary source air emissions will be installed during site <br /> redevelopment. Because this site is proposed to develop over a number of years,future proposals may <br /> include stationary source air emissions..However,it Is not anticipated that the project will include any <br /> boilers or industrial uses. State and local codes will help ensure that any proposed air emission <br /> sources will not adversely impact air quality. . <br /> 25. Wi11 the project generate dust,odors,or nolse"during construction and/or operation?QYes ❑No <br /> If yes,describe the sources,characteristics;duration;and quantities or intensity,and any proposed measures to <br /> the location of sensitive receptors in the vicinity and estimate the <br /> mitigate adverse impacts. Also identify <br /> impacts on these receptors. <br /> During construction,noise and dust typical of construction activity and construction machinery will be <br /> generated. Construction activity will be confined to the hours between 7:00 a.m.and 7:00 p.m.to <br /> minimize the objectionable effects of construction noise. it is not anticipated that the construction <br /> process will generate significant odors. Airborne dust will be suppressed with application of water <br /> during dry periods to control wind erosion. <br /> it is anticipated that the prtncipal'source of noise during site operation will be additional traffic along <br /> ost sensitive noise receptors include the multi-family <br /> roadways surrounding the development: The.m <br /> residential development to the north end east. Although no mitigation measures are proposed on the <br /> north and east sides of the project,the additional traffic noise generated by the site would not likely <br /> increase beyond levels generated prior to the.dramatic decrease In Apache Plaza's occupancy rate. An <br /> foot tall berm Intercedes.between the site and the single-family area northwest of the site, <br /> providing a substantial noise and sight buffer to this area. No objectionable dust or odors are expected <br /> during site operation. <br /> 26. Are any of the following resources on or In proximity to the site: <br /> a. archeological,historical,or architectural resources?13 Yes El No <br /> b. prime or unique farmlands?I7 Yes H:No" <br /> c. designated parks,recreation areas,'or trails?0 Yes No <br /> d. scenic views and vistas?❑Yes El No <br /> e. other unique resources?❑Yes El No . <br /> If any items are answered Yes,describe the resource and identify any impacts on the resource due to the <br /> project. Describe any measures to be taken to minimize or avoid adverse impacts. <br /> Westwood Professional Services, Inc. ��' <br />
The URL can be used to link to this page
Your browser does not support the video tag.