My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01161996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 01161996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:27:23 PM
Creation date
12/30/2015 6:27:16 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 01161996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/02/96 17:21 ^&612 937 5822 WESTWOOD PRO SN'S 16020 <br /> Page 16 <br /> DRAFT—Silver Lake Center EAW <br /> January 2, 1996 ` <br /> e. Is other development anticipated on adjacent lands or outlots? Eyes 0 No <br /> If yes,briefly describe the development and its relationship to the present project. <br /> Project proposers are not speculating'about the ultimate development of the 4.96 acre lot to be <br /> located In the southwest corner of the site. <br /> d. If a,b,or c were marked Yes,discuss any cumulative environmental impacts resulting from this project and <br /> the other development. <br /> Because 100 percent of the area proposed.for the 4.96 acre lot located In the southwest corner of <br /> the site is covered by Impervlous surface,no addiilonal or cumulative environmental impacts are <br /> anticipated. <br /> 31. Other Potential Environmental Impacts If the project may cause any adverse environmental impacts which <br /> were not addressed by items 1 to 2. ,identify and discuss them here,along with any proposed mitigation. <br /> No other potential environmental Impacts are foreseen'. <br /> 32. SUMMARY OF ISSUES (This section need not be completed if the EAW is being done for EIS scoping;instead, <br /> address relevant issues in the draft Scoping Decision document which must accompany the EAW.) List any <br /> impacts and issues identified above that may require further investigation before the project is commenced. <br /> Discuss any alternatives or mitigative measures that have been or may be considered for these impacts and <br /> issues,including those that have been or may be ordered as permit conditions. <br /> CERTIFICATIONS BY THE RGU -'(WI 1 3 certifications.must be signed for EQB acceptance of <br /> the EAW for publication of notice in.the EQB Monitor) <br /> I hereby certify that the information contained in this document is accurate and complete to the best of my <br /> knowledge. <br /> Signature <br /> I hereby certify that the project described in this EAW is the complete project and there are no other projects,project <br /> stages,or project components,other than those described in this document,which are related to the project as <br /> "connected actions"or"phased actions,"as defined,respectively,at Minn.Rules,pts.4410.0200,subp.9b and subp. <br /> 60. _ <br /> Signature <br /> I hereby certify that copies of the completed EAW are being sent to all points on the official EQB EAW distribution <br /> list. <br /> Signature <br /> Title of signer Date <br /> Westwood Professional Services,Inc. ,�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.