My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11241998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 11241998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:41:12 PM
Creation date
12/30/2015 6:41:07 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 11241998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G BRW <br /> . Us ' A DAMES&MOORE GROUP COMPANY <br /> Thresher Square <br /> 700 Third Street South <br /> Minneapolis,Minnesota 55415 <br /> November 12, 1998 612 370 0700 Tel <br /> 612 370 1378 Fax <br /> Mike Mornson <br /> City Manager <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418-1699 <br /> RE: St. Anthony Parks <br /> Dear Mike, <br /> We are pleased to present this revised proposal for preparation of final design and construction <br /> documents for Phase One improvements in Central Park. Based on discussions at the <br /> November 9`h Parks Commission meeting, refinement,of the"remainder of the Central Park <br /> renovations will take place at a later date. The implementation of the Phase One improvements <br /> are targeted to be completed by July 1, 1999. These improvements will include site grading, <br /> sidewalks, landscaping and decorative fencing supportive of a new multi-age play ground and a <br /> basketball court. <br /> The following work program outlines the tasks to be performed: <br /> I. Field Surveying <br /> The north portion of the park was surveyed this year for the upcoming flood control work. The <br /> rest of the park and school properties need to be surveyed to prepare accurate plans and bid <br /> documents. The survey work will focus on the south portion of the park along 33rd Street and the <br /> water tower. This data will eventually be combined with data from the north and center portions <br /> of the park to create a complete physical survey of Central Park. <br /> • Obtain digital site data including, property boundaries, locations of sewer, water and <br /> storm drain utility lines, buildings, trees over.8 inches in diameter, curb and gutter and <br /> corresponding elevations,and etc. <br /> Translate field data into a base map'for accurately engineering proposed park.. <br /> improvements. <br /> Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.