Laserfiche WebLink
ark!" BRW <br /> ® A DAMES&MOORE GROUP COMPANY <br /> Mike Morrison <br /> November 12, 1998 <br /> Page 3 <br /> Award Construction Contract** <br /> Construction Inspection ** <br /> ** Construction related services are not included in the fee estimate. They vary in cost based <br /> upon the scope of involvement. Typically, a full service scope of construction <br /> administration, layout, staking and inspection runs between 7% and 9% of the final <br /> construction contract price. We will be better able to quote a fee for this work following the <br /> final design stage and with more input from the public works director. <br /> Schedule and Meetings <br /> We estimate the entire process will take approximately 3 to 4 months. We propose to finalize the <br /> Phase One plans by the end of March, 1999 to allow bid letting in April and construction in May <br /> and June. Surveying should begin as soon as possible to avoid problems caused by snow cover. <br /> Regular review meetings, (1 per month) with the public works director and Parks Commission <br /> will be part of the design and engineering process. <br /> Fees <br /> Task I, Field Surveying $ 5,000 <br /> Tasks II- III $ 3,500 <br /> Phase One Task IV 4,500 <br /> Total $13,000 <br /> Direct expenses would be billed additionally and would include such things as mileage, blue <br /> printing, photocopying and color reproductions. We estimate that expenses will run <br /> approximately$100. <br /> Offices Worldwide <br />