Laserfiche WebLink
NOV-19-1996 96 1618 WSB & ASSOL it-iTBS INC. r,�,:�5411700 i'.02/03 <br /> - B.A.Nualsteadt,P.E. <br /> 350 Westwood Lake Office Bn:t A.Wein,P.E. <br /> 8441 Wayzata Boulevard neer R Wlllenbring,P.P. <br /> Minneapolis, MN 66426 Donald W.sterna;P.E. <br /> • Ronald H.Bray,P.E. <br /> 612-541-4800 <br /> &Associates,Inc. FAX 541-1700 <br /> November 19, 1998 <br /> Honorable Mayor, City Council and Staff <br /> City of St Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418-1699 <br /> Re: Change in Conditions for the Silver Point Park Excavation Project <br /> WSB Project No. 1065.31 <br /> Dear Mayor,Council and Staff: <br /> This letter has been written to advise you we have encountered a change in conditions in the Silver <br /> Point Park project. To date, the contractor has removed approximately 17,500 cubic yards of <br /> material from Silver Point Park. Of this material, approximately 2,500 cubic yards would be <br /> • considered as common excavation and 15,000 pubic yards is special excavation (removal of . <br /> construction debris),which is double the 7,000 cubic yards of special excavation anticipated in the ' <br /> contract. <br /> The contract quantity for special excavation was determined as follows; <br /> • Soil borings were completed within Silver Point Park to determine the type of soils present. . <br /> • Residents at the public hearing indicated that demolition debris was used to fill an old <br /> swamp,which is now Silver Point Park. <br /> • Following the public hearing,additional soil borings were undertaken within Silver Point <br /> Park to determine the location of this material. <br /> • Approximate limits and quantity of this material were determined from conversations with <br /> residents and soil boring results. <br /> Due to concerns that there may be significantly more quantities of debris in Silver Point Park,an <br /> additional investigation of the park was conducted on Tuesday,November 171. This investigation <br /> consisted of digging large test pits throughout Silver Point Park, an activity that could not be <br /> undertaken in the past without destroying the park. A map showing the location and type of material <br /> encountered in Silver Point Park will be presented at your Council Meeting on November 24 . As <br /> you may be aware,we did anticipate encountering construction debris consisting of concrete,wood, <br /> small diameter pipe, bricks and stucco resulting from the demolition of a building which was used <br /> as fill in Silver Point Park. In addition to these materials,the investigation on Tuesday also found <br /> • the presence of bottles,paint cans,tires,railroad ties,asbestos pipe,and limited petroleum products. <br /> Infrastnrcture Engineers Planners <br /> • Rt1t lA 1 <br /> 1`IWPjViM106J.11�llll7Cd-hmt wpd <br />