Laserfiche WebLink
(4) Schedule of anticipated starting and completion date of each land • <br /> disturbing activity including the installation of construction site erosion <br /> control measures needed to meet the requirements of this Section. <br /> (5) Provisions for maintenance of the construction site erosion control <br /> measures during construction. <br /> (c) Drawing of final site conditions. A drawing of final site conditions on the same <br /> scale as the existing site map showing the site changes including: <br /> (1) Finished grading shown at contours at the same interval as provided above <br /> or as required to clearly indicate the relationship of proposed changes to <br /> existing topography and remaining features. <br /> (2) A landscape plan, drawn to an appropriate scale, including dimensions and <br /> distances and the location, type, size and description of all proposed <br /> landscape materials which will be added to the site as part of the <br /> development. <br /> (3) A drainage plan of the developed site delineating in which direction and at <br /> what rate storm water will be conveyed from the site and setting forth the <br /> areas of the site where storm water will be allowed to collect. <br /> size alignment and intended use of an <br /> (4) The proposed � Y structures to be <br /> erected on the site. <br /> (5) A clear delineation and tabulation of all areas which shall be paved or <br /> surfaced, including a description of the surfacing material to be used. <br /> (6) Any other information pertinent to the particular project which in the <br /> opinion of the applicant is necessary for the review of the project. <br /> 1675.07. Plan Review Procedure. <br /> Subd. 1. Process. Plans meeting the requirements of Section 1675.06 shall be submitted <br /> by the Public Works Director to the Planning Commission for review under Section <br /> 1675.08. The Commission shall recommend approval, approval with conditions, or <br /> denial. Following Planning Commission action,the plan shall be submitted to the City <br /> Council at its next available meeting. City Council action on the plan must be <br /> accomplished within 120 days following the date the application is filed with the Public <br /> Works Director. <br /> -5- <br />