My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 80-078 RESOLUTION MODIFYING THE 1980 BUDGET
StAnthony
>
City Council
>
City Council Resolutions
>
1980
>
RES 80-078 RESOLUTION MODIFYING THE 1980 BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:10:22 PM
Creation date
12/30/2015 7:10:20 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1980
SP Name
RES 80-078 RESOLUTION MODIFYING THE 1980 BUDGET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> MEMORANDUM <br /> DATE: November 6 , 1980 <br /> TO: Jim Fornell, City Manager <br /> FROM: Larry Hamer, .Public Works Director <br /> SUBJECT: Sanitary Sewer - Silver Lane <br /> I received a call that the sewer at 3408 Silver- Lane was plugged <br /> on 11/1/80. We investigated and found the manhole. where the sewer <br /> goes to was in 12" of water. . I told the homeowner that we would have <br /> to investigate this situation more thoroughly Monday._ <br /> The crew televised`. the line and found that when the, line was installed <br /> a break .was put in the elevation part of the 178 foot line which <br /> flows to the west and part of the line flows to the east. The mis- <br /> take in this procedure is the part of line flowing to the east goes <br /> to a deadend manhole where 3408 Silver Lane .is connected. This was <br /> one of the biggest errors' I have seen in the sanitary system. If <br /> a break in elevation is made,. it is- normally done by installing a <br /> manhole at the breaking. point .and.. connected to a downstream line. <br /> This line is not functionable . and we must dig the line and make the <br /> flow go to the west. The depth of this sewer is. too deep for our <br /> machine to dig,, so we must rent a. machine to dig the new main. <br /> The following is a list of the costs involved: <br /> Machine rental @ .$130 . 00/day for 3 days $ 390 .00 <br /> Pipe replacement 600 .00 <br /> Road. restoration/curb. replacement 500. 00 <br /> Total $1,490 .00 <br /> Unanticipated lift pump repair 500 . 00 <br /> Total $1,990 . 00 <br /> Therefore, I recommend a budget transfer of $2 ,000 .00 out of account <br /> Fund 10A to 702-4810-3370 , Maintenance and' Repairs-Other. <br /> I also recommend that we proceed as .soon as possible with the <br /> replacement of this sewer due to the weather and the necessity of <br /> providing an. adequate sewer for this resident. <br /> LH/cjk - <br />
The URL can be used to link to this page
Your browser does not support the video tag.