My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 81-024 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH SOO LINE RAILROAD AND THE COMISSIONER OF TRANSPORTATION FOR INSTALLATION AND MAINTENANCE OF RAILROAD CORSSING SIGNALS
StAnthony
>
City Council
>
City Council Resolutions
>
1981
>
RES 81-024 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH SOO LINE RAILROAD AND THE COMISSIONER OF TRANSPORTATION FOR INSTALLATION AND MAINTENANCE OF RAILROAD CORSSING SIGNALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:07:16 PM
Creation date
12/30/2015 7:07:12 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1981
SP Name
RES 81-024 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH SOO LINE RAILROAD AND THE COMISSIONER OF TRANSPORTATION FOR INSTALLATION AND MAINTENANCE OF RAILROAD CORSSING SIGNALS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOO LINE RATLRO D, COMPMJY <br /> GRADE GROSSING 1'1:i TECCI.ON <br /> ST. ANITHO,!Y, NINi`;ESOTA <br /> EST11-IATED <br /> I•IATERIAL ESTLIATE' UNIT QUANTITY COST <br /> *If Roadway Gates L ach 2 $ $,000 <br /> Flashing Light Signals/Cantilevered Each 2 6,200 <br /> Bungalow ' Each 1 3,600 <br /> Foundations Each 8 800 <br /> Rectifier Each •2 555 <br /> Transformer Each 1 175 <br /> Neutral Relays Each 7 1,925 <br /> Flasher Relay Each 1 440 <br /> AFTAC System FLMD Model 2 Each 2 13,124 <br /> Storage Battery Each 7 770 <br /> Case Wire Material Lot 1 440 <br /> Underground Cable Lot 1 1,100 <br /> A.C.- Service Each 1 310 <br /> Bonds and Rail Connections Each 10 60 <br /> Pipe 3" Galvanized L.F. 105 460 <br /> TOTAL $37,959 <br /> Track Material Lot 1 L_330 <br /> $38,289 <br /> Tax 4% STORES 5% 3,446 <br /> TOTAL MATERIAL $41,735 <br /> Engineering Tabor and Supervision $ 1,000 <br /> cnal Labor 8,000 <br /> ction C_cU: Labor 330 <br /> Accounting Labor 330 <br /> TOTAL LABOR $ 9,660 <br /> Labor Additives 53.86% $ 5,203 <br /> Equipment Rentals 1,650 <br /> Crew Expense: 2 3G0 <br /> TOTAL LABOR ADDITIVES $ 9,153 <br /> TOTAL ABOVE ACCOUNTS $60,548 <br /> CONTINGENCIES 107 $ 6,055 <br /> ESTIMATED COST $66,603 <br /> OFFICE OF THE CHIEF ENGINEER TYPE OF <br /> F.tQGIP ELr ING DI;PAR'.[7Il:iv'1' STATE PF:OjCT j P `a-Q o 3d <br /> S00 LINE RAILROAD -- — - <br /> - -- -— ——� <br /> I':IId\EAI'OLTS, I•Il\ivESO:L'A rd�h\Pr P!':U IPCT <br /> T. RY, GAC DATE_ 11-28-SO <br /> LOCATION.S�• <br /> DME <br />
The URL can be used to link to this page
Your browser does not support the video tag.