Laserfiche WebLink
• 1 . Project Engineer . The Cities mutually agree <br /> upon the firm of Short, Elliott, Hendrickson, Inc. <br /> ( hereinafter called the "Engineer " ) to, do the engineering <br /> work in connection with the Project. <br /> 2. Administration of this Agreement and the <br /> Project. This Agreement and the Project, and related <br /> matters including the advertisement for bids and the award <br /> of a construction contract for the Project, shall be <br /> administered by St. Anthony, with advice and consultation, <br /> and supervision of the Project, by the Engineer . <br /> 3 . Preparation of Plans; Description of <br /> Project. As soon as is reasonably possible,-- the Engineer <br /> shall cause construction plans and specifications to be <br /> • prepared for the Project ( hereinafter called the <br /> "Plans" ) . The Plans shall be divided into the following <br /> three ( 3 ) sections: <br /> ( a) Section I . A storm sewer system <br /> ( hereinafter called the "Storm Sewer" ) to <br /> drain certain areas within St. Anthony and <br /> Roseville. These areas shall be as <br /> designated in the Joint Power Agreement <br /> Storm Sewer Feasibility Study prepared by <br /> Short , Elliott , Hendrickson, Inc. and dated <br /> November , 1950 . The Storm Sewer shall be <br /> constructed in the right-of-way of Anthony <br /> Lane North in St. Anthony and in an easement <br /> to be obtained by Roseville over certain <br /> property in Roseville adjoining the St. <br /> Anthony property. <br /> ( b) Section II . Street reconstruction <br /> ( hereinafter called the "Street <br /> Reconstruction" ) for Anthony Lane North from <br /> Ramsey County Road "C" to a terminus <br /> -3- <br />