My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
StAnthony
>
City Council
>
City Council Resolutions
>
1982
>
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:58:58 PM
Creation date
12/30/2015 6:58:55 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1982
SP Name
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> • <br /> to this document; except, under the Preliminary Report Phase, the Owner shall <br /> pay for the Phase I report on a per diem basis based upon Schedule B but not <br /> to exceed $3,600.00. <br /> 4.1.2. "Construction cost of the Project" as herein refer.red. to means the <br /> total cost of all the work designed or specified by the Engineer for the Proj- <br /> ect, including Change Orders, but does not include any payments to the Engi- <br /> neer or other Consultants, the cost of the land rights-of-way or other costs <br /> which are the responsibility of the Owner as provided herein in SECTION 3. <br /> 4.1.3. Progress payments to the Engineer shall be made in proportion to ser- <br /> vices performed. The compensation for Engineer's Services shall amount to the <br /> following percentage of the total fee at completion at each phase of the work: <br /> a. Upon completion of the Preliminary Report Phase, the Owner will <br /> pay to the Engineer based upon the actual time spent at the rates <br /> • <br /> shown on Schedule "B" attached, but not to exceed $3,600.00. <br /> b. Upon completion of the Design Phase the Owner will pay to the En- <br /> gineer a sum equal to 65X of the -Engineer's fee, based upon the <br /> total amount of the contract for the Project let by the Owner. <br /> c. For services rendered in the Construction Phase the Owner will <br /> pay to the Engineer a sum equal to 20X of the Engineer's fee, <br /> based upon the actual total construction cost of the project, <br /> payable in direct proportion to the construction work completed. <br /> Payments to be made monthly. <br /> 4.2. Payment for Additional Services <br /> 4.2.1. The Owner shall pay the Engineer for Additional Services of the Engi- <br /> neer performed under SECTION 2, "ADDITIONAL SERVICES." <br /> - 9 - <br /> 3274b <br />
The URL can be used to link to this page
Your browser does not support the video tag.