Laserfiche WebLink
r <br /> • <br /> to this document; except, under the Preliminary Report Phase, the Owner shall <br /> pay for the Phase I report on a per diem basis based upon Schedule B but not <br /> to exceed $3,600.00. <br /> 4.1.2. "Construction cost of the Project" as herein refer.red. to means the <br /> total cost of all the work designed or specified by the Engineer for the Proj- <br /> ect, including Change Orders, but does not include any payments to the Engi- <br /> neer or other Consultants, the cost of the land rights-of-way or other costs <br /> which are the responsibility of the Owner as provided herein in SECTION 3. <br /> 4.1.3. Progress payments to the Engineer shall be made in proportion to ser- <br /> vices performed. The compensation for Engineer's Services shall amount to the <br /> following percentage of the total fee at completion at each phase of the work: <br /> a. Upon completion of the Preliminary Report Phase, the Owner will <br /> pay to the Engineer based upon the actual time spent at the rates <br /> • <br /> shown on Schedule "B" attached, but not to exceed $3,600.00. <br /> b. Upon completion of the Design Phase the Owner will pay to the En- <br /> gineer a sum equal to 65X of the -Engineer's fee, based upon the <br /> total amount of the contract for the Project let by the Owner. <br /> c. For services rendered in the Construction Phase the Owner will <br /> pay to the Engineer a sum equal to 20X of the Engineer's fee, <br /> based upon the actual total construction cost of the project, <br /> payable in direct proportion to the construction work completed. <br /> Payments to be made monthly. <br /> 4.2. Payment for Additional Services <br /> 4.2.1. The Owner shall pay the Engineer for Additional Services of the Engi- <br /> neer performed under SECTION 2, "ADDITIONAL SERVICES." <br /> - 9 - <br /> 3274b <br />