My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
StAnthony
>
City Council
>
City Council Resolutions
>
1982
>
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:58:58 PM
Creation date
12/30/2015 6:58:55 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1982
SP Name
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.2.1. Consult with the Owner to ascertain the Owner's requirements for the <br /> Project. <br /> 1.2.2. ' Prepare and submit to the Owner a Comprehensive Engineering and Feasibil- <br /> ity Report on the Project. This Report shall indicate the scope of the Project <br /> and shall specifically cover at least the following subjects: Preliminary de- <br /> sign; cost estimates; list of permits required from other governmental and ad- <br /> ministrative bodies; project sketches; and such other information and data as are <br /> required to fully inform the Owner as to the proposed project. The Report shall <br /> be compiled in appropriate form and fifteen (15) copies thereof shall be sub- <br /> mitted to the Owner. <br /> 1.2.3. Outline, in sufficient detail to enable the Owner to make reasonable <br /> judgments thereon, the anticipated permanent and temporary easements and rights- <br /> of-way needed for the construction of the Project. <br /> 1.2.4. Present the data contained in the Report to the Council at public hear- <br /> ings with the use of maps and diagrams which depict the nature and location of <br /> the Project. <br /> 1.3. ' Design Phase <br /> Upon receipt of the Owner's written authorization to implement the Prelim- <br /> . ,•� <br /> inary Report, and to proceed with the Design Phase the Engineer shall: <br /> 1.3.1. Design and prepare detailed working plans and specifications for the <br /> Project. During the consideration and preparation of said designs, plans and <br /> specifications, the Engineer shall periodically consult with the Owner to insure <br /> the Owner's desires with respect to the Project are being satisfied. <br /> 1.3.2. Prepare the Contract Documents, which shall include construction agree- <br /> ment forms, payment and performance bond forms, general conditions, special <br /> provisions, detailed construction drawings, specifications and proposal forms; <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.