Laserfiche WebLink
after discussion of the same with Owner. Change Orders shall be processed as <br /> soon as practical after written approval thereof has been received by the En- <br /> gineer from the Owner. <br /> 1.5.8. Conduct construction progress reviews with the Contractor and the <br /> Owner related to the Contractor's date of completion. <br /> 1.5.9. Conduct in the presence of the Owner's Public Works Director periodic <br /> tests during the course of construction. <br /> 1..5.10.. Conduct in the presence of the Owner's Public Works Director a final <br /> inspection of the project as constructed to determine whether it conforms with <br /> the design concept of the project as contained in the Contract Documents, and <br /> determine whether it is constructed in accordance with the Contract Docu- <br /> ments. The Engineer shall prepare a punch list for the Contractor, listing <br /> thereon work left to be completed by the Contractor.. The Engineer shall cert- <br /> ify his recommendation for acceptance of the work to the Owner and then shall <br /> forward to the Owner his written approval of the Contractor's Request for Final <br /> Payment which shall be signed by the Contractor. <br /> 1.5.11. Attend assessment hearings relating to the Project and answer ques- <br /> tions of the Public and City Council. <br /> SECTION 2. ADDITIONAL SERVICES <br /> 2.1. General <br /> If authorized in writing by the Owner, the Engineer shall furnish or ob- <br /> tain from others those services which are not covered herein by SECTION 1. <br /> "ENGINEER'S SERVICES." Payment for such services shall be as provided herein <br /> in SECTION 4. "PAYMENT TO THE ENGINEER." Said Additional Services include <br /> - 5 - <br /> 3274b <br />