My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
StAnthony
>
City Council
>
City Council Resolutions
>
1982
>
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:58:58 PM
Creation date
12/30/2015 6:58:55 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1982
SP Name
RES 82-062 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH BONESTROO AND ASSOCIATES FOR ENGINEERING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.1.5. The Engineer shall be available to testify as an expert witness for <br /> • the Owner in any litigation or other proceedings involving this Project and <br /> shall otherwise assist the Owner or his representative in connection with lit- <br /> igation or other proceedings involving the Project. <br /> 2.1.6. If requested by the Owner or recommended by the Engineer and approved <br /> by the Owner, one or more full-time resident Project Representatives shall be <br /> furnished by the Engineer and directed by the Engineer in order to provide the <br /> Owner with cont-inuous representation at the Project site during the Construc- <br /> tion Phase. Such Resident Project Representative will be paid for by the <br /> Owner as indicated in SECTION 4. "PAYMENT TO THE ENGINEER: " paragraph 4.2.4. <br /> 2.1.7. Prepare and furnish the Owner as an Additional Service, a set of re- <br /> producible mylar "Record Plans" of the Project. <br /> • SECTION 3. THE OWNER'S RESPONSIBILITIES <br /> The Owner will: <br /> 3.1. Provide full information as to his requirements for the Project. <br /> 3.2. Assist the Engineer by placing at his disposal all available written <br /> data pertinent to the project site, including existing reports and other data <br /> affecting the design and/or construction of the Project. <br /> 3.3. Acquire all land, easements and rights-of-way for the Project. <br /> 3.4. Guarantee access to the Project site and make all provisions for the En- <br /> gineer to enter upon public and private lands as required by the Engineer to <br /> perform his services under this agreement. <br /> 3.5. Examine all studies, reports, sketches, opinions of construction costs, <br /> specifications, drawings, proposals and other documents presented by the Engi- <br /> neer and the Owner shall promptly render in its decisions pertaining thereto. <br /> • <br /> 7 - <br /> 3274b <br />
The URL can be used to link to this page
Your browser does not support the video tag.