My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 83-017 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEEN THE CITY OF ST. ANTHONY AND THE SALVATION ARMY FOR FEASIBILITY STUDY COSTS
StAnthony
>
City Council
>
City Council Resolutions
>
1983
>
RES 83-017 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEEN THE CITY OF ST. ANTHONY AND THE SALVATION ARMY FOR FEASIBILITY STUDY COSTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:57:50 PM
Creation date
12/30/2015 6:57:49 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1983
SP Name
RES 83-017 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEEN THE CITY OF ST. ANTHONY AND THE SALVATION ARMY FOR FEASIBILITY STUDY COSTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of St: Anthony <br /> August 2, 1982 <br /> Page 2 <br /> areas. The ' engineering services also would provide a basis for <br /> coordination between all designated representatives of St. 'Anthony, <br /> Columbia Heights, New Brighton, Ramsey County, the Salvation Army, <br /> Rice Creek Watershed District and Anoka County, as required. <br /> The foregoing study is to be presented in a bound report form with <br /> complete discussion, preliminary drawings, substantiating data, design <br /> basis and calculations together with cost estimates for the proposed <br /> facilities; including suggested apportionment of cost to each <br /> participating and affected unit' .of government. The drainage problems <br /> relating to Stinson Boulevard will be dealt with in a separate section <br /> of the report such that such data can be easily identified. <br /> Our compensation for the above services shall be on the basis of 2.30 <br /> times payroll cost, mileage and out of pocket expenses. The hourly <br /> charge-out rate shall be based upon the attached schedule. <br /> The estimated cost on the foregoing basis for services of this <br /> proposal will not exceed $7,000. <br /> Under- this proposal, St. Anthony agrees to make available to us and <br /> furnish us with all existing improvement information in the way of <br /> mapst records, plans, contours, profile studies, etc. which 'are <br /> available in response to work undertaken herein, including such <br /> information as may be pertinent and necessary from Columbia Heights, <br /> New Brighton, Ramsey County and Anoka County. <br /> It is to be specifically understood that engineering services in this <br /> proposal do not include the cost of laboratory analysis, the cost of <br /> boundary surveys or underground exploration of the subsurface <br /> conditions. These items wil be furnished on request and our actual, <br /> cost therefore. <br /> It is to be understood that in signing this, proposal we are authorized <br /> to proceed only with the work outlined herein. No work in conjunction <br /> with plans and specifications will be undertaken without further <br /> authorization. <br /> It is to be specifically understood that i•f we are authorized to make <br /> this study and report that work shall commence as soon as weather <br /> permits and be completed within 90 days thereafter unless the scope of <br /> the work is enlarged and/or another completion date is mutually agreed <br /> on. <br />
The URL can be used to link to this page
Your browser does not support the video tag.