My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 84-020 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE COUNTY ROAD "D" PROJECT
StAnthony
>
City Council
>
City Council Resolutions
>
1984
>
RES 84-020 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE COUNTY ROAD "D" PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:54:22 PM
Creation date
12/30/2015 6:54:19 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1984
SP Name
RES 84-020 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE COUNTY ROAD "D" PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• DIVISION OF COST <br /> EXHIBIT A CSAH 93 <br /> PAGE 3 OF' 3 FRON_9ELDON DRIVE TO EAST COUNTY LINE -(HIGHCREST ROAD),_ _ <br /> HENNEPIN COUNTY PROJECT 7205, S.P. 27-693-01 <br /> C TOTAL % COST % COST j <br /> ESTIMATED ESTIMATED ESTIMATED HENNEPIN 'HENNEPIN CITY OF CITY OF <br /> ITEM UNIT QUANTITY UNIT COST COST COUNTY COUNTY ST. ANTHONY ST. ANTHONY °( <br /> CONCRETE CURB 8 GUTTER. DESIGN 8624 LIN. FT. 2655 $ 5.65 $ 15.000.75 50 $ 7,500.38 50 $ 7,500.37 .I <br /> (ON 37TH AVE. ONLY) "� <br /> STORM SEWER (CATCH BASINS AND LEADS) { <br /> DESIGN SP-2-C.B. NOS. 101,102.106.107, EACH 8 850.00 6.800.00 50. 3.400.00 50 3.400.00 <br /> 120.121.122.133 <br /> DESIGN LP4-4 -. C.B. NO. 112 EACH 1 1.200.00 1.200.00 50 600.00 50 600.00 <br /> 1 DESIGN LP.4-6 - C.B. NOS. 105.113.119. EACH 6 1.300.00 7.800.00 50 3.900.00 50. ` 3,900.00 i <br /> i 124.127.131 <br /> ! DESIGN LP4-6 - C.B. NO. 117 EACH 1 1.350.00 1.350.00 50 675.00 50 675.00 - <br /> 150 REINFORCED CONCRETE PIPE LIN. FT. 591 24.50 14.479.50 50 7.239.75 50 7.239.75 k <br /> STORM SEWER (NON-PARTICIPATING) (1) 8.567.87 - 100 8.561.87 <br /> TIMBER WALL SQ. FT. 938 6.30 5.909.40 50 2.954.70 50 2.954.70 <br /> FULL TRAFFIC-ACTUATED TRAFFIC CONTROL SYSTEM 0.5 85.000.00 42.500.00 50 21.250.00 50 .-21.250.00 <br /> SIGNAL SYSTEM A <br /> Is 6" VALVE BOX ANO.ASSEMBLY ASSEMBLY 1 450.00 450.00 0 100 450.00 <br /> V SUBTOTAL $104.057.52 $47.519.83 $56.537.69 <br /> i <br /> BALANCE OFCONSTRUCTION _5395.341,13 $ 95.341.13 F <br /> TOTAL ESTIMATED COST FOR'CONTRACT.ITEMS $499.398.65 $442.B6O,96_ $56.537.69 i <br /> PLUS 13% FOR ENGINEERING 8 CONTRACT ADMINISTRATION (SUB-TOTAL) 7.349.90 <br /> s LESS 76.74% FEDERAL PARTICIPATION FOR'ALL 0NTRACT ITEMS EXCEPT 36.466.71 <br /> STORM SEWER (NON-PARTICIPATING) AND' 6' VALVE BOX AND ASSEMBLY <br /> RIGHT OF WAY 255,000.00 50 127.500.00 S0 127,500.00 ! <br /> TOTAL ESTIMATED COST - ST. ANTHONY'S ;. $154.920.88 <br /> (1) BASED ON THE RATIO OF CONTRIBUTING'AREAS WITH STATE AID FUNDS AND INPLACE OUTFALL <br /> LINES CREDITED AS SHOWN IN MN/DOT'S HYDRAULIC HEMO DATED SEPTEMBER 27. 1982. a ', <br /> AMOUNT IS EQUAL TO 3.1% OF TOTAL STORM SEWER COST FOR PROJECT ON RAMSEY CR 'D' <br /> FROM SILVER LAKE ROAD TO CLEVELAND AVENUE j <br /> AWH:lar <br /> 2/10/84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.