My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 84-030 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH THE CITIES OF ROSEVILLE AND ST. PAUL FOR A WATERMAIN INTERCONNECTION ON BEHALF OF THE CITY OF ST. ANTHONY
StAnthony
>
City Council
>
City Council Resolutions
>
1984
>
RES 84-030 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH THE CITIES OF ROSEVILLE AND ST. PAUL FOR A WATERMAIN INTERCONNECTION ON BEHALF OF THE CITY OF ST. ANTHONY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:53:46 PM
Creation date
12/30/2015 6:53:44 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1984
SP Name
RES 84-030 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO ENTER INTO AN AGREEMENT WITH THE CITIES OF ROSEVILLE AND ST. PAUL FOR A WATERMAIN INTERCONNECTION ON BEHALF OF THE CITY OF ST. ANTHONY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Roseville agrees to supply St. Anthony with the <br /> • water which shall be the same treated water supplied by St. Paul, and <br /> Roseville undertakes no responsibility for the quality of said water <br /> other than transmitting it to St. Anthony withreasonable care to <br /> prevent contamination .and pollution. <br /> C. St. Anthony shall meet the construction require- <br /> ment herein by submitting to Roseville plans for construction of a <br /> metering system within St. Anthony. Such plans and specifications <br /> shall be deemed approved by Roseville unless written objection thereto <br /> is made by Roseville within twenty days after receipt of same. <br /> Section IV. Water Rates and Time of Payment. <br /> A. Roseville shall, monthly or quarterly, at its <br /> option, submit a statement of charges to St. Anthony. St. Anthony <br /> shall pay same within thirty days of receipt: <br /> 1) The added cost to Roseville , charged by St. Paul, <br /> for supplying water to St. Anthony. <br /> 2) All additional costs incurred by Roseville for the <br /> • administration of this contract or transmitting water <br /> to St. Anthony, including but not limited to, costs of <br /> reading and maintaining meters , costs of billing <br /> St. Anthony and any, legal or engineering cost in <br /> administering or enforcing this contract. <br /> 31 All additional costs incurred by Roseville for <br /> pumping, water quality testing, and other reasonable <br /> costs related to supplying water. <br /> Section V. Meter Reading and Billing. <br /> A. Monthly reading of , the master meter or meters at <br /> the point or points of delivery to St. Anthony shall be made by Rose- <br /> ville on the last working day of each month. <br /> B. St. Anthony shall supply a master meter at each <br /> point of connection. These master meters shall be of a size, type <br /> and design approved by Roseville. Roseville will undertake all reading <br /> of these meters . Costs therefore, shall be borne by St. Anthony as <br /> • provided in Section IV. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.