Laserfiche WebLink
Exhibit "A" <br /> Page 1 o7 1 <br /> • FEE SCHEDULE <br /> Unit of <br /> Item Measurement Quantity Unit Price Total Fee <br /> Snow and Ice Control Lump Sum 1 $5,300.00(1) $5,300.00 <br /> Sweeping and Cleaning Center Line Mile 5.94(2) 235.69 1,400.00 <br /> Center Median Cleaning Lump Sum 1 200.00 200.00 <br /> TOTAL HENNEPIN COUNTY FEE $6,900.00 <br /> (1) If any of the highways or portions thereof covered by this agreement are <br /> removed from the County system during the term of this agreement as provided <br /> by law, the County's annual fee for snow and ice control shall be recomputed <br /> as follows: <br /> • $5,300.00 - 5,300 X A X B = Total annual Fee for Snow <br /> 2.97 5 and Ice Control ; <br /> Where: A = Number of miles removed from County System. <br /> B = Number of winter months the mileage removal was in <br /> effect. (For the purpose of this computation, <br /> winter months shall be construed to be the per- <br /> iod from January 1 to April 15 and from Novem- <br /> ber 15 to December 31 of each calendar year giving <br /> a yearly total of five months. ) <br /> (2) Estimated quantity consists of two sweepings as per Article II of this <br /> agreement. For each sweeping, the County shall pay $235.69 multiplied by the <br /> number of miles in the County system at the time each sweeping and cleaning <br /> operation is performed. <br /> • <br />