My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 88-047 RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD AND THE SOUTH CITY LIMIT LINE
StAnthony
>
City Council
>
City Council Resolutions
>
1988
>
RES 88-047 RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD AND THE SOUTH CITY LIMIT LINE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:43:48 PM
Creation date
12/30/2015 5:43:46 PM
Metadata
Fields
SP Box #
21
SP Folder Name
RES 1988
SP Name
RES 88-047 RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD AND THE SOUTH CITY LIMIT LINE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST ANTHONY ASSESSMENT <br /> RCM NO. 861019-01 <br /> • TOTAL SECTION A COST <br /> --------------------------------------------------------------- <br /> -UNIT PROJECT PROJECT <br /> ITEM DESCRIPT UNIT PRICE TOTAL COST <br /> ---------------- ---------------------------------------------- <br /> Mobilization LS $9,525.00 1 $9,525.00 <br /> Field Office EA $2, 175. 00 1 $2, 175.00 <br /> Rmv Conc Curb LF $1 . 10 5443 $5,987. 30 <br /> Rmv B624 C & G LF $1 . 10 31 $34. 10 <br /> Rmv 8" Strm Sew LF $5.0.5 66 $333. 30 <br /> Rmv Conc Pavm't - - SY -- $1.45 94.71 - $13,73.2.95 = _ - <br /> Rmv Bit Pavm't SY $1 . 10 321.6 $353.76 <br /> Rmv Catchbasin ' EA $75.00.' 4 $300.00 <br /> Saw Bit Pavm't LF $2. 45 182.5 $447. 13 <br /> Unclass Excav CY $3. 95 7699 $30,411.05 <br /> Topsoil Borrow (LV) CY $7.60 388.5 $2,952.60 <br /> Geotextile Fabric SY $0. 70 11246 #7,872.20 <br /> Aggr Class 3 TON $4. 30 8397.6 $36, 109.68 <br /> Aggr Class 5 TON $5. 15 7446.92 $38,351 .64 <br /> Bit Mtr ' 1 /Mix TON $14-0.00 84.5 $11 ,830.00 <br /> Binder Course TON $8.65 709 $6, 132.85 <br /> Base Course TON $8.60 929.24 $7,991 . 46 <br /> Bit Mtr '1/Mix TON $140. 00 45.3 $61342.00 <br /> • Wearing Course Mixtur TON $1.5. 75 . 809.09 $12,743. 17 <br /> Tack Coat GAL $1 . 20 475 $570.00 <br /> Granular Bedng CY $8. 10 35.91 $290.87 <br /> 6" Perf Drain Pipe LF $9. 10 136 $1 ,237.60 <br /> 12" RC Pipe LF $35. 35 64 $2,262.40 <br /> Const CB Dsgn N EA 5880.00 4 $3,520. 00 <br /> Conc C & G B618 LF $4.05 5213 $21 , 112.65 <br /> Cont C & G B624 LF $7.60 20 $152.00 <br /> Conc C & G B6 LF $7.05 $0.00 <br /> Conc Drive Apron CY $135. 00 59 $7,965.00 <br /> Bale Check EA $5.95 42 $249._90 <br /> Sodding SY $1 . 50 2075 $3, 112.50 <br /> Pavm't Marking LS $335.00 1 $335.00 <br /> Traffic Control Devic LS $3,000. 00 ' 1 $3,000.00 <br /> ------------ <br /> SUB TOTAL SECTION "A" $237,433. 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.