Laserfiche WebLink
ST ANTHONY ASSESSMENT <br /> RCM NO. 861019-01 <br /> • TOTAL SECTION A COST <br /> --------------------------------------------------------------- <br /> -UNIT PROJECT PROJECT <br /> ITEM DESCRIPT UNIT PRICE TOTAL COST <br /> ---------------- ---------------------------------------------- <br /> Mobilization LS $9,525.00 1 $9,525.00 <br /> Field Office EA $2, 175. 00 1 $2, 175.00 <br /> Rmv Conc Curb LF $1 . 10 5443 $5,987. 30 <br /> Rmv B624 C & G LF $1 . 10 31 $34. 10 <br /> Rmv 8" Strm Sew LF $5.0.5 66 $333. 30 <br /> Rmv Conc Pavm't - - SY -- $1.45 94.71 - $13,73.2.95 = _ - <br /> Rmv Bit Pavm't SY $1 . 10 321.6 $353.76 <br /> Rmv Catchbasin ' EA $75.00.' 4 $300.00 <br /> Saw Bit Pavm't LF $2. 45 182.5 $447. 13 <br /> Unclass Excav CY $3. 95 7699 $30,411.05 <br /> Topsoil Borrow (LV) CY $7.60 388.5 $2,952.60 <br /> Geotextile Fabric SY $0. 70 11246 #7,872.20 <br /> Aggr Class 3 TON $4. 30 8397.6 $36, 109.68 <br /> Aggr Class 5 TON $5. 15 7446.92 $38,351 .64 <br /> Bit Mtr ' 1 /Mix TON $14-0.00 84.5 $11 ,830.00 <br /> Binder Course TON $8.65 709 $6, 132.85 <br /> Base Course TON $8.60 929.24 $7,991 . 46 <br /> Bit Mtr '1/Mix TON $140. 00 45.3 $61342.00 <br /> • Wearing Course Mixtur TON $1.5. 75 . 809.09 $12,743. 17 <br /> Tack Coat GAL $1 . 20 475 $570.00 <br /> Granular Bedng CY $8. 10 35.91 $290.87 <br /> 6" Perf Drain Pipe LF $9. 10 136 $1 ,237.60 <br /> 12" RC Pipe LF $35. 35 64 $2,262.40 <br /> Const CB Dsgn N EA 5880.00 4 $3,520. 00 <br /> Conc C & G B618 LF $4.05 5213 $21 , 112.65 <br /> Cont C & G B624 LF $7.60 20 $152.00 <br /> Conc C & G B6 LF $7.05 $0.00 <br /> Conc Drive Apron CY $135. 00 59 $7,965.00 <br /> Bale Check EA $5.95 42 $249._90 <br /> Sodding SY $1 . 50 2075 $3, 112.50 <br /> Pavm't Marking LS $335.00 1 $335.00 <br /> Traffic Control Devic LS $3,000. 00 ' 1 $3,000.00 <br /> ------------ <br /> SUB TOTAL SECTION "A" $237,433. 11 <br />