Laserfiche WebLink
-5- <br /> Silver Lake Road and 34th Avenue and railroad boring <br /> near Silver Lake Road and 37th Avenue will be included <br /> in the pipeline work. The project is further described <br /> in paragraph 1.2.2 below. <br /> Project Manager <br /> The person designated by the State to coordinate, <br /> monitor and manage the project and to be the point of <br /> contact in matters related to this agreement. <br /> Project Site <br /> The City property and easements areas on or through <br /> which the remedy is to be constructed.. <br /> Record of Decision (ROD) <br /> The documentation of the EPA's decision making process <br /> for approving federal fund-financed remedial actions <br /> under CERCLA. The ROD for the St. Anthony remedial <br /> action, dated March 31, 1987, is one of several needed <br /> for the TCAAP Site. It stated that the GAC treatment <br /> facility and the pipeline fra, well 5 to the facility <br /> along with 0 and M for 10 years is the selected remedial <br /> action for the contaminated St. Anthony water supply, <br /> • and that treated water should be discharged into the St. <br /> Anthony municipal water distribution system. <br /> Remedial Action (RA) <br /> The RA consists of rehabilitation of well #3; <br /> construction of a GAC treatment facility to treat water <br /> frmm wells #3, #4, and #5 (including facility access <br /> road) ; construction of a pipeline to connect well #5 to <br /> the GAC facility; preparation of RA operations and <br /> maintenance (0 & M) plan for 10 years; and start up. <br /> Remedial Design (RD) <br /> The phase of remedial activities during which the plans <br /> and specifications are produced and incorporated into a <br /> bid package acceptable to the EPA, the City and the. <br /> State. The EPA assigned its consultant Engineer, Camp <br /> Dresser and McKee, Inc. , to prepare the plans and <br /> specifications for the St. Anthony Water Supply RA. The <br /> State and the City have been reviewing. <br /> • <br />