My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL MINUTES 07171984
StAnthony
>
Parks & Planning Commission
>
Planning Commission Minutes
>
1984
>
PL MINUTES 07171984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:04:32 PM
Creation date
12/30/2015 6:04:30 PM
Metadata
Fields
SP Box #
21
SP Folder Name
PL MINUTES AND AGENDAS 1984
SP Name
PL MINUTES 07171984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8- <br /> adjoining <br /> -adjoining property owners of record within 350 feet of the subject <br /> property. No one present reported failure to receive that notice <br /> • or objected to its content and the Manager reported receiving no <br /> objections to the request. <br /> Commissioner Wagner stepped down temporarily to discuss the church' s <br /> proposal. He is a member of the church and the Financial Chairman <br /> on the Building and Rebuilding Committee . He .said the church Com- <br /> mittee had considered several alternatives as to whether to rebuild <br /> at the present site or somewhere else. Their decision had been to <br /> rebuild onsite and would involve about a $300,000 expense to the <br /> church with 'the remainder of the cost expected .to be picked up by <br /> insurance coverage. Commissioner Wagner indicated the first thing <br /> the Committee decided to do was to expand the sanctuary and increase <br /> the seating capacity. He said they also proposed to expand the park- <br /> ing spaces to bring them up .to code, which would somewhat relieve <br /> onstreet parking problems . Other changes proposed- for the interior <br /> would include handicapped .accessibility ramps to both levels and a <br /> provision to be installed for the handicapped along with improvements <br /> in the bathrooms . The nursery school would have ground floor access <br /> and an outdoor play area directly connected to the school and the <br /> kitchen area would also be improved, Commissioner Wagner said. <br /> Area neighbors were surveyed on the previous Sunday and did not <br /> object to any of the proposed rebuilding. The original church was <br /> erected in 1957 and the education wing along Belden Drive was added <br /> in 1965 . Commissioner Wagner indicated the targeted completion date <br /> was Easter, however he had reservations about that timeframe.. He <br /> • informed the Commission members the project, including furnishings , <br /> will cost about $1- million. <br /> Commissioner Wagner went on to say the church has a seating capacity <br /> for 210 seats and the proposed parking capaci.ty ::is-..proposed to <br /> increase from 60 to 84 spaces . Commissioner Bjorklund indicated he <br /> would like to see a larger play area which could perhaps be ac- <br /> complished by cutting the proposed parking spaces from 84 to 79 . <br /> Commissioner Wagner believes the church Committee would be amenable <br /> to that suggestion. <br /> There was no opposition to the proposal, however, a neighbor, Dan <br /> Korba, 2708 Hilldale , was present to express his concern with the <br /> snow plowing and granite chips which .had been placed on the surface <br /> of the parking lot at the church. Mr. Korba said the plow plows the <br /> snow across the parking lot directly into his front _yard. He would <br /> like that to cease. He suggested the situation could be rectified if <br /> the church could enlarge the lot and reduce snow storage on the <br /> property. Mr. Korba also wondered if a barrier for headlights had <br /> been considered which would screen the lights from beaming into the <br /> residents ' windows . Commissioner Wagner indicated he will bring the <br /> plowing problem to the attention of the church trustees and he had <br /> not realized this was a concern. <br /> The public hearing was closed at 10 : 02 P.M. by Chairman Zawislak for <br /> • Commission consideration and action. <br /> Motion by Commissioner Bjorklund and seconded by Commissioner Hansen <br /> to recommend the Council approve the plan for rebuilding Faith United <br />
The URL can be used to link to this page
Your browser does not support the video tag.