My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL MINUTES 12191989
StAnthony
>
Parks & Planning Commission
>
Planning Commission Minutes
>
1989
>
PL MINUTES 12191989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:42:21 PM
Creation date
12/30/2015 5:42:19 PM
Metadata
Fields
SP Box #
21
SP Folder Name
PL MINUTES AND AGENDAS 1989
SP Name
PL MINUTES 12191989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 6 <br /> 1 for eight feet . <br /> 2 <br /> 3 Mr. Nedegaard stated that the distance to the retaining wall <br /> 4 will be approximately 18 feet on Lot Number 3 after the <br /> 5 variance request is granted , or four feet from the right. of <br /> 6 way . Chairperson Madden asked whether Mr . Nedegaard <br /> 7 intended to install guardrail on top of the retaining wall , <br /> 8 and Mr. Nedegaard replied that he would be willing to look <br /> 9 at that option or to do additional landscaping on the <br /> 1.0 boulevard, if that is required. Mr. Nedegaard told the <br /> 11 Commission that he did not intentionally create the problem <br /> 12 and that he would be willing to construct the unit properly <br /> 13 _^.less some accomn.-!_., 3 ti-= r-r uld he out . <br /> lz <br /> 15 Cor.missioner Brownell asked whether the building was <br /> 16 designed in accordance with the final plat as approved by <br /> 17 City Council - Mr . 3dedegaard replied that it was . <br /> .10 Commissioner Brownell stated that the hullding design (foes <br /> 19 not appear to be in accordance with the plan initially <br /> 20 submitted . Assistant Jandarrieyden noted that the initial <br /> 21 plan had been changed. Commissioner Brownell stated that <br /> • 22 the preliminary plat showed a 30-foot setback to the <br /> 23 buildings . <br /> 24 <br /> 25 Chairperson Madden asked Mr. Nedegaard for the measurement <br /> 26 of the Lot 1 side yard setback, and Mr. Nedegaard stated <br /> 27 that it is 15 feet . The Commission compared the preliminary <br /> 28 plat with the map of the property as it now exists , and <br /> 29 found a number of adjustments that had been made. <br /> 30 <br /> 31 Commissioner Wagner asked Mr . Nedegaard why he replied <br /> 32 affirmatively in his petition for variance that the <br /> 33 difficulty or hardship is caused by city ordinance. Mr . <br /> 34 -Nedegaard replied that he didn' t think the situation would' <br /> 35 infringe on any of the neighbors . Commissioner Wagner <br /> 36 stated that he found it difficult to see how the hardship <br /> 37 was created by city ordinance since the city ordinance was <br /> 38 in place before the project was planned or built. Mr. <br /> 39 Nedegaard replied that the biggest hardship from his point <br /> 40 of view was that he entered the situation after the problem <br /> 41 had been created. <br /> 42 <br /> 43 Commissioner Hansen asked Mr . Nedegaard what he would do if <br /> 44 the variance request were denied. Mr . Nedegaard replied <br /> 45 that he . woul*d have to go back and rip the basement out and <br /> 46 conform exactly to the ordinance . <br /> 47 <br /> 48 The public hearing was closed at 8 : 13 p. ;n. <br /> 49 <br /> 50 Commissioner Wagner stated that he had no objection to <br />
The URL can be used to link to this page
Your browser does not support the video tag.