1108 Nlaollet Avenue
<br /> Hinneapol-IoMane sot
<br /> Hon.: ,Mayor- and Village Council' February. 2201954
<br /> St., Are"hony.", Minne ao-ta,
<br /> GENTLEMEN.'
<br /> Etigdnecr'&. Final Certifica-te Of Acceptance
<br /> Of The Sanitary- Sdwers Within- SAnitary Sewer Extensions-
<br /> Within_ C-re,stview. Terrace Addition To St.. Anthony Minn,,
<br /> Thib. is. to inform_ you that we have made, an.. inspection
<br /> of the construction- a=s:- well as to- the materials used in. the
<br /> construction. of the Sanitary Sewers within- Crest View.. Terrace
<br /> Addition,,.and we f-ind the same aomplles:7, in�all' respects with
<br /> the plans and. specifications therefor ,heretofore adopted by- your
<br /> HonorabI6- Body A. and therefor we have accepted the same and- we-
<br /> reciommend that this- acceptance be approved by your honorable
<br /> body,, on-behalf- of the Village of S t, .Ant hony,_-,jj,41n-ms-'o_ta;i-,
<br /> We- further- certify that the improvement contains
<br /> the following at pri:ces�, stipultLted in said contract and extra-
<br /> work orders-,
<br /> ORIGINAL C-MTTRACT Lump Sum. 4 27,,163600
<br /> 5563: lin..ft.. 9 inch VIX-,(�80_wer Pipe
<br /> . 0
<br /> 22 drops for: manholes under- c-on-struct-ion in the above 40 manho-lez,
<br /> 1 drop for an, exeisting manhole
<br /> Lowering 4 existing manholes,-.
<br /> 5867: lin...ft. . 05 iftc:h V,,.C .servI:ae lines
<br /> Replacing 600 sq'**ydB,_B'la' cktop- pavement
<br /> ADDITIONS TO C-ONTRACIT
<br /> 1742 lIrr..ft.'..9 inch V X.Sewer Pipe @ 0 3.00 $ 426..00
<br /> Crushed: rock used as found:ation. matiarial-
<br /> beneath the pipe line on, Silver Ld--Re Rd:...
<br /> 50 cu.yd-. . @ 0 5....00 250'.00 e,
<br /> 'Grave 1'.backf ill used: in,, bl&cktop street
<br /> arasaings, and service lines: In. the.
<br /> Blac-ktop streets
<br /> 3780.- _$ 1 -20 cu,iyd:s @ 4
<br /> I
<br /> Total Additiona- ----------------- 1129e. 0
<br /> $ 28p,292..60C.
<br /> DEDUCT IONS -TO CONTRACT
<br /> Ice. line @ §11.�50 187.20
<br /> 117' ]:i. n,,,ft;..6' inc,,h Vr.P7-,S6ry 96.00 C.
<br /> 384 Sq.ydt,.. Blacktop :street- re--placed @ 0.25 -
<br /> deductlons-� --------- --- -
<br /> Total - $ 283.20
<br /> Tot'al' Construatign, Cost ------------------------- 28PO09-.60"
<br /> Engineering- @ 6,% ----------------------------- 1,680.57
<br /> Inspection--- ----------------------- 442083
<br /> Total cost of #roject le-ss legal and administration--- 30, 33.00
<br /> Respbetfully subihitted
<br /> MacGregor and Davis
<br /> Architect' and, Bagi era
<br /> b, v 4
<br /> E'N.Comstock.Engineer