My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11151988
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1988
>
PL PACKET 11151988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:29:43 PM
Creation date
12/30/2015 3:29:41 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1983
SP Name
PL PACKET 11151988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1108 Nicollet Ane.So• <br /> Minneapolis,Minneaota <br /> February 23,1954 <br /> Hons Mayor and Village Council <br /> Ste Anthony,Minnesota <br /> Gentlemenx <br /> ENGINEER'S FINAL CERTIFICATE OF ACCEPTANCE <br /> This is to inform you that we have made an inspection <br /> of the construction as well as to the materials used in the <br /> construction of the Watermain Extensions within Creat View <br /> Addition,and we find the same complies in all respects with the <br /> plans and specifications therefor,heretofore adopted by your <br /> honorable body,and therefor we have accepted the same and we <br /> recommend that this acceptance be approved bjr your honorable <br /> body on behalf of the, Village of St. Anthony,Minnesotae <br /> We further certify that the improvement contains the <br /> following at prices stipulated in said contract and-extra work- <br /> order_ s. - - <br /> - OR IG IATAL CONTRACT - <br /> TOTAL LUMP SUM------ $ 2419876.40 <br /> 4460 lineft• 6"cast iron mechanical jointed watermaiii <br /> 4 - 6" Brass mounted gate valves <br /> 7 - 6"-5"valved opening fire hydrants <br /> 127 - 1" Corpoeation cocks <br /> 127 - 1"Stop cocks and boxes <br /> 4609 lin-ft. 1" copper service lines <br /> Replacing 600 sq.yds. Blacktop pavement <br /> ADDITIONS TO CONTRACT' <br /> 3: - 6" Gate valves @ 1 100000-- 3 0.00 <br /> 36 cu-yds. Gravel fill @ 1.20 43.20 <br /> TOTAL ADDITIONS TO CONTRACT.. 643.20 <br /> MR <br /> b� 19.6 <br /> D-MUCTIONS FROM CONTRACT <br /> 214 lin•ft. 6" C.I-P. @ 3.20 684.80 <br /> 296 lin.ft. 1" Copper @ 1.60 473:60 <br /> 570 sq.yds• Blacktop @ 0.25 142.50 <br /> TOTAL DEDUCTIONS FROM CONTRACT ---- s3 , . . l 300.90 <br /> TOTAL AMOUNT OF-WORK COMPLETED) <br /> ENGINEERING ' @.6% n 9938,70 <br /> 435.12 <br /> TOTAL COST OF .PROJECT LESS- LEGAL AND ADMINISTRAT <br /> Respectfully submitted <br /> MacGregor sad Da,-Vis <br /> Ar h t to a En vers <br /> by - <br /> V-Coms oc ,Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.