Laserfiche WebLink
December 28, 1998 { <br /> Silver Point Park Excavation Storm Sewer Installation <br /> Crews from Richard Knutson, Inc. (RKI) are EJM Pipe Services is in the process of tunneling a <br /> continuing excavation work in the park. The bulk of pipe underneath the County Road 88 Frontage <br /> the excavation and the trucking of materials off of Road. Schedules were upset when a mechanical <br /> the site should be completed by problem delayed the tunneling for <br /> December 31". During the month QUESTIONS? several days and the Holidays <br /> of January RKI will be finishing making for two short working <br /> up the slopes, as well as workingweeks. EJM anticipates completing <br /> on the ball fields, trails, basketball, Resident's Contact Person:Bryon Amo this portion of the project by the <br /> and parking lot areas. WSB & Associates, Inc. week of January 11, 1999. <br /> Bryon's Cell Phone: Upon completion of the tunneling, <br /> 518-0482 RKI plans to make a pipe <br /> connection at St. Anthony <br /> Central Park Excavation Bryon's Pager: Boulevard and complete the <br /> 539-8601 installation of storm sewer which <br /> Originally it had been anticipated will serve as the outlet for Silver <br /> that construction in Central park Bryon's Truck: Point Park drainage. As part of this <br /> would begin in the spring of 1999. Red Mazda B2000 activity the frontage road will again <br /> However, with'the late arrival of be reopened and the temporary <br /> winter we anticipate excavation to access removed. Portions of the <br /> begin in Central Park on Wednesday, December frontage road will remain gravel until it is warm <br /> 30`h. Weather permitting, the stormwater storage enough to pave this spring. <br /> area in the north end of the park should be <br /> completed by January 15, 1999. If you have any questions or concerns about the <br /> project please do not hesitate to contact Bryon <br /> Amo. In the event you cannot reach Bryon Amo, <br /> please call Todd Hubmer, the Project Engineer, at <br /> 541-4800. <br /> WSB&Associates,Inc. 350 Westwood Lake Office Park Minneapolis,MN 5542( <br /> (612) 541-4800 8441 Wayzata Boulevard <br />