My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 12142015
StAnthony
>
City Council
>
City Council Work Session
>
2015
>
CC WORKSESSION 12142015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 11:51:25 AM
Creation date
1/27/2016 11:49:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. The City would be reliant on a single groundwater source. <br /> <br />Estimated Capital and Long Term O&M Costs <br />Estimated capital and long term O&M costs were based on present worth analysis. The <br />total estimated cost for Option 5, including contingency and indirect costs, are shown in <br />Table 4 along with the estimated O&M costs over a 20-year life cycle. A detailed cost <br />estimate for Option 5 can be found in Appendix D. <br /> <br />Table 4: Option 5 Estimated Costs <br />Estimated <br />Capital Cost <br /> <br />Finance <br />Cost (4% <br />Interest) <br />Estimated <br />O&M Cost <br />(3.5% Interest <br />Rate) <br />20-Year Cost <br />of <br />Purchasing/ <br />Producing <br />Water <br />Total 20-Year Cost <br />$7,177,600 $3,385,200 $1,080,200 $4,954,000 $16,597,000 <br /> <br /> <br />1,4-DIOXANE PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 3183-00 PAGE 18
The URL can be used to link to this page
Your browser does not support the video tag.