My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 05042015
StAnthony
>
City Council
>
City Council Work Session
>
2015
>
CC WORKSESSION 05042015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 1:26:39 PM
Creation date
1/27/2016 1:21:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />CC Worksession <br />May 4, 2015 <br />3) Adding a clause to allow the continuation of existing solar systems, unless an upgrade requiring <br />a building permit is proposed; <br />4) Clarifying the structural integrity requirement to add "to the satisfaction of the building <br />inspector" <br />5) Referencing conditional use permit criteria in city code; <br />6) Eliminating the requirement for a licensed contractor- allow homeowner to install, with the <br />issuance of a building permit. <br />ITEMS RECOMMENDED BY CITY COUNCIL <br />1. Flush mounted vs. building mounted systems. The Council provided direction to staff and the <br />Planning Commission to allow only flush mounted on the front of homes and commercial <br />structures, but to allow building mounted in the rear portion of the roof, but not allowed at all <br />on accessory structures. Planning Commission is supportive of this, but recommends allowing <br />solar systems on accessory structures as well. <br />Example "flush- mounted" solar energy systems <br />Example "building- mounted" solar energy systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.