My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 05042015
StAnthony
>
City Council
>
City Council Work Session
>
2015
>
CC WORKSESSION 05042015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 1:26:39 PM
Creation date
1/27/2016 1:21:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />CC Worksession <br />May 4, 2015 <br />6) Requires proof of structural integrity to the satisfaction of the building inspector <br />7) Allows free standing solar energy systems in the rear yards of residential, with applicable <br />standards, including double the side yard setback <br />8) Added specific standards for lightpoles <br />9) Added design and performance standards for solar energy systems <br />ACTION <br />Staff recommends reviewing the draft ordinance and providing input on final edits. <br />NEXT STEPS <br />This draft ordinance will go to a public hearing at Planning Commission on May 18, 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.