Laserfiche WebLink
Draft revised 4.28.15- -- - Forma <br />LioWole mounted solar energy systems. _ _ _ _- _ _ _ Forma <br />(a) Any solar installation on a light pole shall require the issuance of a conditional use permit. <br />and shall take into account the surrounding land uses the proposed visual impact, and the <br />structural integrity relative to size and height of the proposed solar installation. <br />(C) Design and Performance Standards In addition the t dar& required ah v the %Mowing <br />is andards shall apply to aU solar energy systems <br />(1) Compatibility with nearby oro-wrties The visual impact of rooftop equipment on nearby <br />properties shall be minimized through such means as location on the roof flush - mounting to the roof. <br />screening or other integration into the roof design Screening shall be of durable permanent materials <br />that are compatible with the primary building materials Screening shall be done to the extent <br />12ossihle wilbout reducing the systems efficiency. <br />television and other communication signal interference <br />(m InstaMian, c r h 11 t Forma =rgy reaulre the lssuance of a building permlt be Installed GPs. <br />,(8) The structure upon which the solar energy system is mounted shall have the structural <br />integrity to cam the weight of the solar energy system Proof of structural integrity shall be submitted <br />to the satisfaction of the building inspector. <br />_Q Administrative Review Process <br />Comahance. <br />• <br />yl' <br />J_ systems <br />shall <br />be <br />desigwd. <br />•1. 1. <br />1 <br />RI <br />- !• -- 1. 1- .1. 1 {- 1' .n /. <br />/.1a <br />- salar "1- J_ sygem <br />can <br />1- <br />watcr courses, oi other -l—men rlements of the Ila 11 <br />..- <br />_! terferp. with the .1 <br />r <br />. I • <br />U% nte //' • -1.-J— p11. _ 1' <br />-1 <br />!111 repair and <br />.-J.0 <br />l.1 •-1 <br />1 <br />. t <br />11•. n• fmmgwQrk, or Qthcr comoments. <br />Abandonment, . -l- J_ systern Lhd <br />is allowed <br />to mmin in a <br />umfimclimaLDr <br />.1.11 _ - fQr a I' _a of - onaccutimQ <br />months. and which <br />is not <br />brou&t in <br />1' r 1 <br />be <br />1 - .11-1 b t1. "1 <br />and <br />ila be 1" -1 . <br />television and other communication signal interference <br />(m InstaMian, c r h 11 t Forma =rgy reaulre the lssuance of a building permlt be Installed GPs. <br />,(8) The structure upon which the solar energy system is mounted shall have the structural <br />integrity to cam the weight of the solar energy system Proof of structural integrity shall be submitted <br />to the satisfaction of the building inspector. <br />_Q Administrative Review Process <br />Comahance. <br />• <br />yl' <br />J_ systems <br />shall <br />be <br />desigwd. <br />•1. 1. <br />1 <br />RI <br />•1'Y. <br />"1 <br />in <br />• 1" <br />J 1. <br />1. . 1 <br />1 • <br />1 <br />. t <br />- {! <br />1 • <br />! .. <br />• <br />R <br />•_ <br />i 1 <br />1• <br />11" <br />1- <br />• <br />state <br />_ - vic <br />•1' .1.1 <br />x_11. <br />• <br />" <br />television and other communication signal interference <br />(m InstaMian, c r h 11 t Forma =rgy reaulre the lssuance of a building permlt be Installed GPs. <br />,(8) The structure upon which the solar energy system is mounted shall have the structural <br />integrity to cam the weight of the solar energy system Proof of structural integrity shall be submitted <br />to the satisfaction of the building inspector. <br />_Q Administrative Review Process <br />