Laserfiche WebLink
City Council Regular Meeting Minutes <br /> • September 25, 2001 <br /> Page 6 <br /> Ms. Olivier stated that the Phases were broken down into manageable amounts over the course of <br /> 2 three years. <br /> 3 Phase One: <br /> 4 Exterior Entry-Building Exterior: <br /> 5 -add quoins at corners of the front exterior <br /> 6 -demolition of old facade <br /> 7 -new calwell entry <br /> 8 -signage <br /> 9 -columns <br /> 10 Community Center: <br /> 1 t -carpeting <br /> 12 -building direction sign with pamphlet storage <br /> 13 -seating <br /> 14 -planter <br /> 15 -sound panels <br /> -paint above burnish block <br /> 0 -screen-wall: etched glass panels, wood frame, metal accents. <br /> 18 City Hall Entry: <br /> 19 -new door 3' 0" <br /> 20 -side light: hollow metal <br /> 21 -sound seal <br /> 22 -hardware package <br /> 23 Total cost, Phase One: $52,189.22 <br /> 24 Phase Two: <br /> 25 Exterior Entry-Front Landscaping: <br /> 26 -remove existing shrubs and flag poles <br /> 27 -relocate flag poles to monument sign <br /> 28 -low shrub replacement <br /> 29 -cedar bedding <br /> 30 Entry Landscaping-Patio: <br /> 31 -stamped color concrete <br /> -bike loops <br /> -bench <br />