My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03061996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 03061996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:09 PM
Creation date
4/19/2016 5:54:01 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 03061996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> .LL-A :iew facility located on the subject parcel . A <br /> drawing of the parcel and an approximate building foot <br /> print is attached. • <br /> Our company is proposing to build a 30 , 000 square <br /> feet industrial building to accommodate Systec and up to <br /> three new light manufacturing businesses . <br /> We have reviewed our proposed construction with two <br /> contractors experienced in industrial property <br /> construction and have been advised that the principal <br /> construction concern is the existing soil condition . We <br /> understand that the site was used for disposal of street <br /> or highway demolition debris and that it is likely that <br /> this would need to be completely removed to Permit <br /> construction . Without comprehensive soil testing the <br /> exact cost of the coil correction work cannot be <br /> determined . However , our contractors estimate a worst <br /> case cost to be $ 175 , 000 . We are asking City assistance <br /> for this amount to achieve a buildable site . <br /> Additional basic site preparation work and utility • <br /> installation will total an estimated $ 58 , 000 . This <br /> expense is necessary to prepare the site for final <br /> construction and City assistance is also requested in this <br /> amount . Two versions of a project cost summary are <br /> attached . Version A includes the requested City <br /> assistance . Version B includes no City assistance . It is <br /> anDarent that the project cannot proceed without St . <br /> Anthony participation . <br /> Our company will contribute equity in the amount of <br /> $212 , 500 in land value and cash , financing approximately <br /> $850 , 000 . We expect a market value for real estate taxes <br /> purposes of approximately $ 1 . 2 million. <br /> The benefits to the City for its participation <br /> include: <br /> 1 . The retention of 20 jobs at Systec . <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.