Laserfiche WebLink
35- <br /> At <br /> SAt this point, further analysis on the part of our engineers is required before we can prepare a <br /> meaningful cost estimate. Before incurring additional design and estimating costs, I thought you <br /> may want to have a better sense of what is involved. If you would like us to proceed and to <br /> authorize our engineers to proceed with the necessary calculations required to determine the <br /> eAieiii ui additionai*suu.;iure, equipmeni: and iigiiiing'required, tet me know. Al this time, if we <br /> receive your go ahead, we will not fully design the track but make only the determinations <br /> needed for a cost estimate. This way, the City will incur fewer costs if you decide not to go ahead <br /> with the addition. Give me a call if you have any questions. <br /> Sincerely, <br /> Elizabeth Herrmann <br /> • <br /> • <br />