My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04021996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 04021996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:21 PM
Creation date
4/19/2016 5:54:11 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 04021996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• March 18, 1996 <br /> Larry Hamer <br /> Director of Public Works <br /> City of Saint Anthony <br /> 3301 Silver Lake Rd.N.E. <br /> Saint Anthony 55418 <br /> RE: Proposed PCS Installation on Saint Anthony water tower located at Ciy Amin Offices <br /> Dear Mr. Hamer: <br /> Please accept this letter as a proposal from APT(American Portable Telecom)to enter into a Lease <br /> Agreement for communication and antenna space at the referenced location. APT has retained the <br /> services of TEA Group Incorporated for the purposes of acquiring sites for the installation and <br /> operation of PCS (Personal Communication Services)radio equipment.-, <br /> APT, a subsidiary of Telephone and Data Systems, Inc. was awarded the PCS license by the FCC <br /> for the Minneapolis/St. Paul area. I have enclosed a brochure which describes, in greater detail, <br /> APT and its operation. <br /> • APT engineers have determined that the Saint Anthony Water Tower appears to be suitable for the <br /> location of one of our communication sites. At this time, the typical APT equipment installation <br /> consists of nine (9) directional panel antennas (77" high x 6" wide x 1.5" deep) which operate <br /> within the 1.9 ghz to 2.2 ghz radio frequency range. Additionally, up to four (4) equipment <br /> cabinets (each approximately 5' high x 3' wide x 3' deep), may need to be installed at the site <br /> (initially, the site will need one equipment cabinet). For access, the equipment cabinets will need <br /> to be placed in an area approximately 10' x 25' in size. The area beneath or adjacent to the tower <br /> will do nicely. Typically, these weather-proof, self-contained equipment cabinets are connected to <br /> the antennas by 1 5/8" cable(each antenna requires one cable run). The communication equipment <br /> requires 100 amp, 220 volt, single phase electrical service. <br /> With your input and approval,we will design and engineer a site specific layout for this location. <br /> APT is prepared to make the following offer to you: <br /> TERM: An initial lease term of five(5)years, including three(3) 6-year extension periods. <br /> RENT: 4,500.00 annually, paid in advance. <br /> ESCALATION'S: A 15% increase for each 6-year extension period. <br /> OTHER: All cost associated with the communications site will be paid for by APT. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.