My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04021996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 04021996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:21 PM
Creation date
4/19/2016 5:54:11 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 04021996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> Page 2 • <br /> Larry suggested that the new gas tanks can be budgeted for over the next two years so that <br /> the City can pay for their replacement and installation. He feels whatever monies are not <br /> spent for gas/diesel in budget years 1996 and 1997 can also be put back into this fund to <br /> defray the cost as well. <br /> Zahl Equipment's proposal is as follows: $59,805 <br /> 1. Removal only of all tanks, backfill with clean fill and compact. Dispose of <br /> P P <br /> tanks property. <br /> 2. Install single-wall steel tanks with double-wall fiberglass piping. (30 year <br /> warranty. <br /> In addition, they will furnish material and/or labor in accordance with specifications and <br /> estimates, that include: <br /> 3. Obtain permits, notify the MPCA and Gopher One; demolition asphalt and <br /> concrete over the tanks; haul out rubble and debris; excavate purge with <br /> p g • <br /> CO2, remove one 12,000, one 6,000, one 4,000 and one 1,000 gallon steel <br /> tanks and dispose of them properly. <br /> 4. Backfill-the-6;000 and-the-1,000 gallon-tank basins-with-clean-fill-an <br /> compact; continue excavation to provide and set one 12,000 gallon and one <br /> 6,000 gallon tanks; air test and backfill with clean sand and compact. <br /> 5. Provide and install fiberglass product and vent piping over to the existing <br /> island and pumps. The City will provide and install concrete <br /> overfill/overspill protection pads and pour 6" concrete pads over tanks. <br /> 6. Tie into electrical at the edge of building and installing new conduit/wiring <br /> for tank monitor probes and pumps. Perform precision testing on tanks and <br /> lines. <br /> 7. Start up the monitor system and pumps; calibrate. <br /> Jim Larson of Zahl Equipment advised that the above quoted figure is for budgeting <br /> purposes only. To be on the safe side in determining true cost, he said the City should be <br /> looking at a figure that is closer to $69,000 so that increases in the cost of the tanks or <br /> labor costs can be anticipated. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.