My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07301996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 07301996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:48 PM
Creation date
4/19/2016 5:54:45 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 07301996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 3, 1996 <br /> Mr.Larry Hamer <br /> Public Works Director <br /> City of St. Anthony <br /> 3300 Silver Lake Road <br /> St. Anthony,MN 55418 <br /> Re: State Aid Funding <br /> RCM Project No. 10367.00 <br /> Dear Mr.Hamer: <br /> Per your request, we have reviewed the funds in your State Aid account which are available <br /> for construction. In developing an estimate of available funds, we spoke to the State Aid <br /> office, Ramsey County,and City of Columbia Heights.Based on information obtained from <br /> these sources,a summary of your State Aid construction account is as follows: <br /> rieke $280,230 1995 Balance <br /> mu elr $154,100 1996 Allotment <br /> fates, inc. -($53,000) Estimated City share of signal project at 39th Avenue and Stinson <br /> sneers Boulevard. <br /> itects <br /> land surveyors -($93,186) City share of Silver Lake Road project <br /> -($12,323) City share of Stinson Boulevard railroad crossing upgrade <br /> equal opportunity <br /> employer $275,821 Current Available Funds <br /> We anticipate that your State Aid allocation for 1997 will be approximately$140,000,based <br /> on historical trends. The City will likely have a balance of $415,000 available for <br /> �. construction in 1997. <br /> �= We have developed a cost estimate for street improvements on 33rd Avenue between Stinson <br /> q Boulevard and Highcrest Road.Our estimate is based on the following: <br /> 1. Planing of existing concrete pavement(full width). <br /> 2. Replacement of deficient concrete panels(estimated at 15%of total surface area). <br /> ' 3. Placement of new concrete sidewalk between Stinson Boulevard and Silver Lake <br /> ' Road. <br /> ° 4. Placement of new concrete sidewalk between Sky Croft Drive and Highcrest Road. <br /> _955-199 <br /> 5. Watermain replacement is not included. <br /> _ -•-,_�+- eft <br /> Using these parameters, we estimate the cost for construction, engineering, and inspection <br /> on the segment of 33rd Avenue between Stinson Boulevard and Silver Lake Road to be <br /> $436,000. For the segment of 33rd Avenue between Silver Lake Road and Highcrest Road, <br /> the estimated cost is$441,000. <br /> 1001 red circle drive <br /> box 130 <br /> minnetonka, minnesota 55343-0130 <br /> L2) 935-6901 <br /> (612) 935-8814 <br />
The URL can be used to link to this page
Your browser does not support the video tag.