My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10011996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 10011996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:55:11 PM
Creation date
4/19/2016 5:55:03 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 10011996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TEL No . Sep 20 ,96 16 :34 No .009 P .01 <br /> WiLLMMS/O'BRIEN ASSOCIATES, INC. ARCHITECTS/PLANNERS 1111 3rd AVE.S. MPLS,MN 55404 <br /> Phone:612-338-8981 FAX-612.338-8982 <br /> IJ @gm@ <br /> TO: MIKE MORN50N <br /> FROM: JIM O'BRIEN <br /> DATE: SEPT 20,1996 <br /> RE: CITY HALL AND COMMUNITY CENTER <br /> cc: <br /> REGARDING CHANGE ORDERS: (Information for your work session on Tuesday) <br /> The following Items are priced or are In the process of pricing: <br /> 1. Changes to the electrical to accommodate the Police radio system: add of $2065.00 <br /> Provides junction boxes and empty conduit for installation of radio speaker volume controls at six <br /> • locations; rooms 36, 56, 57, 40, 65 and the wall outside room 70. <br /> Provides junction box and conduit to room 54 for radio amplifier power and communication wiring. <br /> Provides a masthead through the roof in room 54 for antenna. <br /> 2. A credit will 'be Issued for: Omitting curb and omitting the turnaround east of the police area. <br /> The new curb along the west side of the service drive east of the building has been eliminated until <br /> the tennis court work is ready to be done; and the drive has been reduced to 22' to avoid damage to <br /> the existing trees. <br /> 3. There will be a credit for a change to the grading east of the building and reducing the width of the <br /> east service drive. <br /> The water ponding/percolation area in the skating rink area has been redesigned to be more shallow <br /> and there will be less excavation and hauling, therefore a credit. The drive east of the police area <br /> has been raised somewhat to match the ponding area so there will be some additional fill in this area <br /> therefore some extra cost. The drive was reduced in width by 3' to avoid disturbing trees and will <br /> result in a credit. <br /> 4. The council bench change. Graus has had the Information for several days but other subs are Involved <br /> and pricing may be slow. <br /> 5. We are having others look at the fountain without recirculating water, etc. Nothing on that as yet. <br /> 6. We added some paving from the parking lot to the bus stop area west of the building. There will be a <br /> small add for that. This was done yesterday so haven't processed a request for a price as yet. <br /> • Graus has indicated that they will probably have prices dor 2 and 3 but aren't optimistic about 4 by <br /> Tuesday. Liz will get the information to you if and when we get it. Graus Isn't involved in #5 at this <br /> point and their office hasn't received the Information on #6 as yet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.