Laserfiche WebLink
05/27/98 09:43 FAX 6123701378 BRW, INC. IN04/004 <br /> . <br /> atom <br /> V RW <br /> A DAMES S MOORE GROUP COMPkgy <br /> Mike Mornson <br /> May 27, 1998 <br /> Page 3 <br /> Public Hearing and AdverthRement for Bids <br /> Bid Letting** <br /> Award Construction Contract** <br /> Construction** <br /> ** Construction related services are not included-in the fee estimate. They vary in cost based <br /> upon the scope of involvement.Typically, a full service scope of construction administration, <br /> layout, staking and inspection runs between 7%and 9% of the final construction contract <br /> price. <br /> Meetings <br /> Regular review meetings with the public works director,Parks Commission and others would be <br /> part of the design and engineering process. <br /> Fees <br /> Task I,Field Surveying $19,000$58,500*** <br /> Tasks II—VII(including two bid packages) <br /> *** Fee is based on 9%of estimated preliminary construction costs. <br /> We hope this information is helpful in guiding the City's decision making process. We are <br /> excited about building upon�dl the work has done so far and look forward to assisting <br /> St. Anthony in the creation o:f a parks system that we can all be proud of. <br /> Sincerely, <br /> BRW,INC. <br /> f"/-70-4 <br /> Bob Kost,ASLA <br /> Project Manager <br /> 13K/dc <br /> c: Jon Horn,PE-BRW,Bic. <br /> File 35185-001-9901 <br /> U M PLWPo <br /> UP=Woddwwe <br />