Laserfiche WebLink
K-ELLISON CO. <br /> REAL ESTATE DEVELOPMENT AND CONSTRUCTION SERVICES <br /> 7200 HUDSON BLVD ,SUITE 230, OAKDALE,1\I\ 55125 OFFICE 651-730-0100 FAX 651-730-0303 <br /> September 20, 1999 <br /> Mr. Mike Morrison <br /> Saint Anthony Village <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418-1699 <br /> RE: The Hitching Post <br /> 2440 Highway 88 <br /> St. Anthony, MN <br /> Dear Mike: <br /> As we have discussed, the design for The Hitching Post has significantly increased the costs of <br /> the remodel and renovation of the old Town and Country Market for Mr. Furseth. Our design <br /> changes have dramatically increased the aesthetic appeal of the building and have resulted in an <br /> almost entirely new exterior of the building. It will look totally new in every respect and those <br /> people who remember what the Town and Country building looks like will not believe that it <br /> even is the same structure. These changes have been done in part in keeping with the vision that <br /> • the Village of St. Anthony has for the redevelopment of the shopping center and retail area. The <br /> Hitching Post, being the first renovation and redevelopment within this area must set the stage <br /> for the other projects yet to come. This has, of course, only come at a significant price increase <br /> over what Mr. Furseth had initially intended. <br /> As it has been mentioned at the Planning Commission and City Council meeting, we are <br /> requesting that the City provide us with some assistance in the additional costs that we have <br /> incurred by providing us with economic assistance for the site development and for the purchase <br /> of the land which the Hitching Post will provide for the new greenway. We request that the City <br /> purchase the land to be dedicated to the greenway at a price of$5.00/sf. At this time we estimate <br /> that there is approximately 20,000 sf that the City wishes to purchase and therefore we are <br /> estimating a value of approximately$100,000.00 for this land purchase. <br /> With respect to the site development costs, we offer the following as a budget guideline for what <br /> we will be expending based on the anticipated design to meet the City's preliminary plans for the <br /> greenway area. <br /> Landscape Design $ 750.00 <br /> Site Lighting Engineering $ 1,500.00 <br /> Civil Engineering $ 4,700.00 <br /> Site Lighting $ 17,500.00 <br /> Landscaping $ 26,000.00 <br /> • Repaving, resurfacing, and stripping $ 22,000.00 <br /> General Conditions $ 3,600.00 <br /> Overhead and Profit $ 5,000.00 <br /> Total $ 81,050.00 <br />