My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 91-026 RESOLUTION APPROVING A COOPERATIVE AGREEMENT FOR A DRAINAGE SYSTEM CAPACITY STUDY AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE SAID AGREEMENT ON BEHALF OF THE CITY
StAnthony
>
City Council
>
City Council Resolutions
>
1991
>
CC RES 91-026 RESOLUTION APPROVING A COOPERATIVE AGREEMENT FOR A DRAINAGE SYSTEM CAPACITY STUDY AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE SAID AGREEMENT ON BEHALF OF THE CITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 3:09:21 PM
Creation date
4/19/2016 3:09:19 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1991
SP Name
CC RES 91-026 RESOLUTION APPROVING A COOPERATIVE AGREEMENT FOR A DRAINAGE SYSTEM CAPACITY STUDY AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE SAID AGREEMENT ON BEHALF OF THE CITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement No. PW 46-10-91 <br /> County State Aid Highway No. 88 <br /> • City of St. Anthony <br /> County of Hennepin <br /> COOPERATIVE AGREEMENT FOR PARTICIPATION <br /> IN A DRAINAGE SYSTEM CAPACITY STUDY <br /> cz <br /> AGREEMENT, Made and entered into this e75 day of 19q by <br /> and between the County of Hennepin, a body politic and corporate under the laws of the <br /> State of Minnesota, hereinafter referred to as the "County" and the City of St. <br /> Anthony, a body politic and corporate under the laws of the State of Minnesota, <br /> hereinafter referred to as the "City" . <br /> WITNESSETH: <br /> WHEREAS, The City, through its agent Barr Engineering Company, has performed a <br /> preliminary study of the existing drainage capabilities of a watershed known as <br /> Drainage District No. 6 in which County State Aid Highway No. 88 is located; and <br /> • WHEREAS, The findings of said preliminary study indicate that a system capacity <br /> study is warranted to identify cost effective options for solving existing drainage <br /> problems within said Drainage District No. 6; and <br /> WHEREAS, The estimated cost of said System Capacity Study is between $15,000 and <br /> $20,000; and <br /> WHEREAS, The City has requested the County participate in the funding of said <br /> Study for cost effective options, and <br /> WHEREAS, Hennepin County Resolution No. 91-4-403, approved April 23, 1991, <br /> authorized the preparation of a cooperative agreement between the City of St. Anthony <br /> and Hennepin County for said System Capacity Study in which the County's participation <br /> is to be $5,000 or less; and <br /> WHEREAS, It is contemplated that said work be carried out by the parties hereto <br /> under the provisions of M.S. SEC. 162.17, Subd. 1 and SEC. 471.59. <br /> • <br /> -1- Ci , ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.