My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 92-021 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH HENNEPIN COUNTY FOR PARTICIPATION IN THE REGULATORY AND WARNING SIGN REPLACEMENT PROGRAM
StAnthony
>
City Council
>
City Council Resolutions
>
1992
>
CC RES 92-021 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH HENNEPIN COUNTY FOR PARTICIPATION IN THE REGULATORY AND WARNING SIGN REPLACEMENT PROGRAM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 3:05:25 PM
Creation date
4/19/2016 3:05:21 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1992
SP Name
CC RES 92-021 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT WITH HENNEPIN COUNTY FOR PARTICIPATION IN THE REGULATORY AND WARNING SIGN REPLACEMENT PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement No. PW 34-89-89 <br /> • IX <br /> Columbia Heights shall install , or cause the installation of an adequate three <br /> wire, 120/240 volt, single phase, alternating current electrical power connection to <br /> the controller cabinet. The costs, if any, for the installation of the power source, <br /> shall be shared equally by the three cities. <br /> Columbia Heights shall also provide the electrical energy for the operation of <br /> said traffic control signal and integral street lights. Said electrical costs shall <br /> be apportioned 33 1/3% Columbia Heights, 33 1/3% St. Anthony, 33 1/3% Minneapolis. <br /> Columbia Heights shall invoice the other cities for the aforesaid costs as <br /> appropriate upon receipt of any payable invoices by Columbia Heights. <br /> X <br /> Hennepin County will furnish the controller, control equipment and cabinet to <br /> be installed as part of said project. <br /> • XI <br /> Each City shall reimburse Hennepin County for twenty five percent (25%) of the <br /> construction cost of the contract work for said project. The construction cost of <br /> the project shall be the cost of all contract work and County Force Account work <br /> required to complete the project. The costs for each are estimated and apportioned <br /> in said Exhibit "A" . <br /> XII <br /> In addition to the aforesaid payments by each City for its proportionate share <br /> of -the construction cost, each party also agrees to pay to Hennepin County a sum <br /> equal to fourteen percent (14%) of each party's respective share of said contract <br /> construction costs, it being understood that said additional payment by each party is <br /> each parties' proportionate share of all engineering costs (design and contract <br /> administration) incurred by Hennepin County in connection with the work performed <br /> under this contract. <br /> XIII <br /> • Within sixty (60) days after an award by Hennepin County to the successful <br /> bidder of said project, each City shall deposit with the Hennepin County Treasurer <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.