My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 92-050 RESOLUTION ADOPTING A PAVEMENT MANAGEMENT PLAN ANS AN ASSESSMENT POLICY FOR THE CITY OF ST. ANTHONY
StAnthony
>
City Council
>
City Council Resolutions
>
1992
>
CC RES 92-050 RESOLUTION ADOPTING A PAVEMENT MANAGEMENT PLAN ANS AN ASSESSMENT POLICY FOR THE CITY OF ST. ANTHONY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 3:07:17 PM
Creation date
4/19/2016 3:07:13 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1992
SP Name
CC RES 92-050 RESOLUTION ADOPTING A PAVEMENT MANAGEMENT PLAN ANS AN ASSESSMENT POLICY FOR THE CITY OF ST. ANTHONY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• CONDOMINIUMS - COMMERCIAL <br /> Assessments above are spread by dividing them according to the percentage of interest in <br /> common elements. <br /> MINNESOTA STATE-AID ROADWAYS <br /> Non tax-exempt property zoned R-1, R-lA, R-2 and R-3 which abuts Minnesota State Aid (MSA) <br /> streets shall not be assessed for improvements of such streets. All such work will be covered 100% <br /> by Minnesota State Aid funds. All tax-exempt property regardless of zoning class, such as, but not <br /> necessarily limited to schools, churches, parks, government land, will be assessed on a front footage <br /> basis at 50% of the cost of a 7-ton, 32 ft wide pavement (even when heavier roads are constructed). <br /> All property not covered in the above is assessed on a front footage basis at 100% of the cost for the <br /> MSA roadway on which they abut. <br /> STORM DRAINAGE <br /> Improvement costs for storm drainage shall be paid for wholly out of the storm drainage utility fund and <br /> not assessed to benefitted properties. <br /> . SANITARY SEWER AND WATER MAIN Laterals <br /> Sanitary sewer and water main laterals are assessed on a front footage basis with all types of land and <br /> zoning being identically assessed. The assessment for corner and odd-shaped lots follows the same <br /> formula as that stated in the public roadways section. The amount of 100% of the total cost will be <br /> divided among the benefitted property. <br /> SANITARY SEWER AND WATER MAIN Trunk/Subtrunk Lines <br /> Improvement costs for sanitary and water main trunk/subtrunk lines shall be paid for wholly out of their <br /> respective utility funds and not assessed to benefitted properties. New lines will be assessed at 100% of <br /> actual costs. <br /> NON-MOTORIZED PATHWAYS (SIDEWALKS) <br /> Assessments for non-motorized pathways shall not be assessed to residential property abutting the project <br /> but shall be covered 100% by ad valorem taxes. Commercial and industrial property abutting the project <br /> shall be assessed at 50% of the actual cost. <br /> • 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.