My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 00-045 A RESOLUTION ACCEPTING FEASIBILITY REPORT AND AUTHORIZING PREPARATION OF FINAL PLANS AND SPECIFICATIONS FOR THE HARDING STREET LIFT STATION AND FORCEMAIN IMPROVEMENT PROJECT
StAnthony
>
City Council
>
City Council Resolutions
>
2000
>
CC RES 00-045 A RESOLUTION ACCEPTING FEASIBILITY REPORT AND AUTHORIZING PREPARATION OF FINAL PLANS AND SPECIFICATIONS FOR THE HARDING STREET LIFT STATION AND FORCEMAIN IMPROVEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:14:34 PM
Creation date
4/19/2016 4:14:33 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 2000
SP Name
CC RES 00-045 A RESOLUTION ACCEPTING FEASIBILITY REPORT AND AUTHORIZING PREPARATION OF FINAL PLANS AND SPECIFICATIONS FOR THE HARDING STREET LIFT STATION AND FORCEMAIN IMPROVEMENT PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ST.ANTHONY <br /> • RESOLUTION 00-045 <br /> A RESOLUTION ACCEPTING FEASIBILITY REPORT AND <br /> AUTHORIZING PREPARATION OF <br /> FINAL PLANS AND SPECIFICATIONS FOR THE <br /> HARDING STREET LIFT STATION AND <br /> FORCEMAIN IMPROVEMENT PROJECT <br /> WHEREAS, pursuant to direction of the City of St. Anthony, a report has been prepared with reference to <br /> the improvements: <br /> Harding Street Lift Station and Forcemain <br /> This project consists of rehabilitating the existing sanitary sewer lift station structure, <br /> replacing the existing pumps, and constructing new forcemain. <br /> NOW,THEREFORE, BE IT RESOLVED,by the City Council of the City of St. Anthony: <br /> 1. Accepts the Feasibility Report for the Harding Street Lift Station and Forcemain <br /> Improvement Project. <br /> 2. Directs WSB &Associates,Inc.,to prepare final plans, specifications, and bid documents to <br /> • complete the recommended improvements as outlined in the Feasibility Report. <br /> 3. The consulting engineering firm shall prepare and cause to be inserted in the official paper <br /> and in the Construction Bulletin an advertisement for bids upon the making of such <br /> improvement under such approved plans and specifications. The advertisement shall be <br /> published for two times, shall specify the work to be done, and shall state the date that bids <br /> will be opened. No bids will be considered unless sealed and filed with the Clerk and <br /> accompanied by a cash deposit,cashier's check, bid bond, or certified check payable to the <br /> City of St. Anthony for five percent(5%)of the amount of such bid. <br /> Adopted this .2 3 day of rncLq 2000. <br /> ATTEST:&X44� <br /> City Clerk <br /> Reviewed for administration: <br /> • City ager <br /> F:\W P9\Ord&Res\AweptFeas-res.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.